Abstract: TBM tunnelling is one of the most popular methods in the excavation of railway tunnels at urban areas. Due to the large load of TBM, the structure stability of the tunnels and Metro stations would be affected a lot. The monitoring opinions of TBM crossing the Metro stations are presented and the deformation characteristics and influencing factors of tunnels and Metro structure when TBM crossing the stations are studied, with the monitoring practice on Dalongshan station and Ranjiaba station of the first phase on No. 6 line of Chongqing railway transit as an example. In the end, the safety risk of TBM crossing the station is lowered and the structure stability is guaranteed. The paper can provide reference for deformation monitoring of the similar projects in the future.
Key words: overlapping tunnels with short distance, Metro station, TBM crossing station, deformation monitoring, structure stability
WANG Hailong. Monitoring Methods of TBM Crossing Station[J]. Tunnel Construction, 2011, 31(S2): 132-137.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/
http://www.suidaojs.com/EN/Y2011/V31/IS2/132
Metro Jet System and Horizontal Freezing Construction at Zhongsheng Station of Nanjing Metro Line 7 Closely Crossing Underneath an Operation Station
Application of Shield Receiving in Ultra-Deep Foundation Pit Without Main Structure: A Case Study of Dashadong Station of Gungzhou Metro Line 7
Mounting Technology for Steel Brace in Deep Foundation Pit of Metro Station Constructed by Semi-Cover Excavation Method: A Case Study
on Liuyanjing Station of Metro Line 3 in Nanchang, China
Construction Scheme and Mechanical Properties of a Prefabricated Metro Station Constructed by TwinTube Closely Spaced PipeJacking Method
Research and Application of PipeRoof Support Technology for Mined Metro Stations with UltraShallowBuried PipeRoof Cover Method:
a Case Study of Ping′anli Station of Beijing Metro Line 19
Integrated Construction Scheme of Municipal Bridges and Metro Stations Considering Geological Condition: a Case of University City South Station in Chongqing
Stress Characteristics of ConcreteFilled Steel Tubular Column and Surface Deformation in PileBeamArch Station with Different RiseSpan Ratios of Arch:
a Case Study of Xiangheyuan Station on Beijing Metro Line 17
Comparative Analysis of Internal Forces of Prefabricated and CastinPlace Metro Station Structures under Horizontal Earthquake