[1] |
PENG Tao, TONG Yan, ZHANG Guangli, GONG Yanfeng, CHEN Zheng, GUO Yizhong, MAO Qin, LYU Gangyu, HUANG Weihao, DAI Baolian.
Field Experiments for Natural Smoke Exhaust Through
Vertical Shaft of Urban Road Tunnel Under Fire
Condition in Summer
[J]. Tunnel Construction, 2023, 43(7): 1170-1179.
|
[2] |
LIU Zaizheng, KE Wei, YAO Man, JI Zhiyong, WEN Zhongbao, YANG Xu.
Structural Design and Application of Cutterhead for
Graded Excavation of FullFace
Vertical Shaft Boring Machine with SuperLarge Diameter
[J]. Tunnel Construction, 2023, 43(6): 1057-1064.
|
[3] |
BAO Heli, JIANG Hong.
Structural Design of Prefabricated Concrete Segment
for Assembled Shaft
[J]. Tunnel Construction, 2022, 42(S1): 376-381.
|
[4] |
WANG Song, XIE Yunlai, QING Weichen, YANG Changyu, WANG Jianhong, YANG Yi.
Design of Prefabricated Lining Structure at Tunnel
Arch Constructed with Mining Method
[J]. Tunnel Construction, 2022, 42(S1): 360-368.
|
[5] |
HUA Nan, ZHAI Zhiguo, LIU Liu.
Construction Technology for Repairing Damaged Segment
of Shield Tunnel Adjacent to HighVoltage Power Tower
[J]. Tunnel Construction, 2022, 42(S1): 466-479.
|
[6] |
CHU Kai, HE Weiguo, YU Yong.
Route Scheme of Pearl River Estuary Tunnel Project of ShenzhenJiangmen Railway
[J]. Tunnel Construction, 2022, 42(9): 1597-1604.
|
[7] |
HUANG Mingliang, ZHANG Zhenguang, XU Jie, JIANG Hong, BAO Heli, LIU Xian.
Measuring of Shaft Wall Stress in Caisson Construction
Process Based on Vertical Shaft Sinking Machine: a Case Study of
CaissonType Underground
Intelligent
Parking Garage Project in Nanjing, China
[J]. Tunnel Construction, 2022, 42(6): 1033-1043.
|
[8] |
DAI Xin, HE Weiguo, WANG Dongwei, LYU Qingsong, YU Yong.
Drainage Design of a DeepBuried
Subsea Tunnel Using Mining Method: a Case Study of Pearl River Estuary Railway Tunnel
[J]. Tunnel Construction, 2022, 42(4): 695-702.
|
[9] |
KONG Deyu, RAO Junying, MEI Shilong, WANG Yong, ZHAO Shixin, SHE Yuhua.
Construction Mechanical Behavior of Cover Arch Pillar
Method for ShallowBuried and SuperLarge CrossSection Metro Station: a Case Study on Beijinglu Station of Guiyang Metro Line 3 in China
[J]. Tunnel Construction, 2022, 42(10): 1755-1765.
|
[10] |
SUN Feixiang, PENG Zhengyong, ZHOU Jianjun, YANG Zhenxing, ZHANG Jichao, TANG Zongxiong.
Study on Breakthrough Modes in Docking Section between
Shield and Mined Sections Considering Rock Mass Classification
[J]. Tunnel Construction, 2021, 41(8): 1336-.
|
[11] |
QIANG Jian.
Development and Research Direction of Utility Tunnels
Constructed by
Mining Method
[J]. Tunnel Construction, 2021, 41(5): 764-771.
|
[12] |
ZHANG Jinwei, LUO Furong, TONG Lihong, YANG Binbin, XU Qian.
Study on Prefabricated Lining Structure Design of a Metro
Tunnel Constructed
by Mining Method
[J]. Tunnel Construction, 2021, 41(5): 822-830.
|
[13] |
WANG Huanlong, LIU Jianbing, YANG Changyu, ZHU Tingyu.
Case Study of Water Control in a Deep and LargeDiameter
Vertical Railway Shaft in Granite and Analysis of Its
Efficiency
[J]. Tunnel Construction, 2021, 41(3): 402-410.
|
[14] |
GAO Guangyi.
Water Gushing Treatment Technology for Deep and Large
Vertical Shafts of Railway in Waterrich Weathered
Granite: a Case Study on #1 Vertical Shaft of
Gaoligongshan Tunnel on DaliRuili Railway
[J]. Tunnel Construction, 2020, 40(S1): 358-363.
|
[15] |
GUO Chun, SONG Junxiu, WANG Xin, CHENG Jianghao.
Research Status and Development of Dust Control
Technology in Tunnel Constructed by Mining Method
[J]. Tunnel Construction, 2020, 40(S1): 68-74.
|