[1] |
SUN Guowen, SONG Chaoye, LI Guoqing, FU Gongyun, YIN Fang, WU Yuxiang.
Feasibility Study on Design Scheme of Underground
Laboratory by Expanding Existing Mine Tunnel
[J]. Tunnel Construction, 2023, 43(S1): 373-381.
|
[2] |
XIAO Mingqing, SUN Wenhao, QU Liqing, LI Xiang, CHEN Libao, NI Jian, MA Xiangfeng.
Study on General Design of Second Jiaozhou Bay Subsea
Tunnel
[J]. Tunnel Construction, 2023, 43(2): 199-216.
|
[3] |
WU Chenggang, LI Mengting, PENG Zhiyong.
Crosssection Structure Selection of
Prefabricated Station in Shenzhen Metro Line 16
[J]. Tunnel Construction, 2022, 42(S2): 320-327.
|
[4] |
LIAO Xiaochun.
Cost Determinate Method of Tunnel Boring Machine-Type Selection for Hard Rock Tunnels
[J]. Tunnel Construction, 2022, 42(S2): 508-515.
|
[5] |
CHU Kai, HE Weiguo, YU Yong.
Route Scheme of Pearl River Estuary Tunnel Project of ShenzhenJiangmen Railway
[J]. Tunnel Construction, 2022, 42(9): 1597-1604.
|
[6] |
YANG Zhao, XIONG Dongdong, XU Chao, CHEN Shaolin, HE Chuangbo.
Automatic Selection Algorithm for Shield Tunnel
Segment Rings Based on Intelligent Acquisition of
Parameters
[J]. Tunnel Construction, 2022, 42(5): 817-825.
|
[7] |
GUO Jianmin, SHAN Lianjun.
Structure Type and Prefabrication Scheme of Immersed
Tunnels in Urban Core Areas: a Case Study of Pazhou
West Tunnel Project in Guangzhou, China
[J]. Tunnel Construction, 2022, 42(11): 1906-1912.
|
[8] |
LIU Jidong, BAO Zhenhang.
Construction Technology of Shield Tunnel in Extremely-Soft
Fluid Plastic Stratum
[J]. Tunnel Construction, 2021, 41(S2): 527-532.
|
[9] |
ZHANG Xinwei.
TBM Selection and Key Technologies of Qiandao Lake Water Distribution Project
[J]. Tunnel Construction, 2021, 41(S2): 612-619.
|
[10] |
HU Min, CHEN Qianru, LIN Peng.
Dynamic Selection of Maintenance Strategy for LongTerm
Performance of Electromechanical
Equipment for Tunnels
[J]. Tunnel Construction, 2021, 41(9): 1604-1611.
|
[11] |
DU Chuangdong, ZHOU Lujun, DUO Shengjun, HE Fei.
川藏铁路隧道TBM适应性选型分析及不良地质对策与思考
[J]. Tunnel Construction, 2021, 41(6): 897-912.
|
[12] |
LU Zhengang, WANG Jianhua, ZHU Anping, PAN Fuying, LI Kun, CHEN Liangwu.
Design and Application of a Compact TBM for an
Ultrasmall Turning Radius: a Case Study on a Drainage Gallery Tunnel
Project of
Wendeng
Pumped Storage Power Station in Shandong, China
[J]. Tunnel Construction, 2021, 41(6): 1047-1057.
|
[13] |
ZHANG Junru, WANG Zhiyong, REN Zhaodan, KONG Chao, XU Xiangdong, WU Jie.
Evaluation Indices for Bearing Capacity of Concretefilled
Steel Tube
Arch in Highway Tunnel and Reasonable Type Selection
[J]. Tunnel Construction, 2021, 41(4): 569-578.
|
[14] |
LIU Jianbing, YANG Changyu, WANG Huanlong, ZENG Yunchuan.
Engineering Application and Main Control Factors of
Selection of Deep and Large Shaft Location for Railway Tunnel
[J]. Tunnel Construction, 2021, 41(3): 411-418.
|
[15] |
XING Bo, FENG Huanhuan.
Suggestions and Considerations on Equipment Selection
for Constructing Sichuan-Tibet
Railway Tunnels at High Altitudes
[J]. Tunnel Construction, 2021, 41(10): 1644-1653.
|