[1] |
WANG Ru, ZHAI Wuzhou, NI Haibo, HUANG Hongwei.
Numerical Simulation on Mechanical Response of Tunnel
Portal with Segment Lining in Mechanized Construction of Cross Passage of Shield
Tunnel
[J]. Tunnel Construction, 2023, 43(S1): 178-188.
|
[2] |
SUN Helin, JIANG Haibo.
ElasticPlastic Analysis of
Surrounding Rock of Lining Tunnel Considering Seepage
Effect
[J]. Tunnel Construction, 2023, 43(S1): 206-215.
|
[3] |
XU Pengzu, YANG Yandong, XU Haifeng, LIU Wanlin, WANG Tianyi.
Synchronous CastinPlace
Construction Technology and Equipment Development for
TBM Tunnel Invert Arch
[J]. Tunnel Construction, 2023, 43(S1): 480-486.
|
[4] |
JIANG Yajun, ZHAO Jumei, HE Yudi, LIU Jitai, PEI Huqiang.
Mechanical Characteristics of Interface Between Layers
of DoubleSided Adhesive
SprayApplied Membrane Waterproof Tunnel Lining
[J]. Tunnel Construction, 2023, 43(6): 1003-1011.
|
[5] |
JIANG Hualong.
Construction Technology of Earth-Pressure
Balance-Shield Crossing Underneath Existing Large-Cross-Section Metro Tunnel with Unreinforced Secondary Lining
[J]. Tunnel Construction, 2023, 43(5): 837-846.
|
[6] |
SUN Mingshe, WU Xu, SONG Kezhi, GUO Caixia, WU Guangming.
Earliest Lining Construction Time Based on
Displacement Back Analysis Method
[J]. Tunnel Construction, 2023, 43(12): 2046-2055.
|
[7] |
WANG Leming, TANG Guorong, MENG Qingyu, MA Zhifu, GONG Jiangfeng.
Overall Design of Chongming-Taicang
Yangtze River Crossing Tunnel of Shanghai-Chongqing-Chengdu High-Speed Railway
[J]. Tunnel Construction, 2023, 43(12): 2098-2113.
|
[8] |
HU Changming, WANG Yahui, TIAN Penggang, ZHANG Lisha, YANG Kunda.
Mold Removal Time and Reliability of Open-Cut
Tunnel Lining
[J]. Tunnel Construction, 2023, 43(11): 1821-1830.
|
[9] |
SUN Xingliang, GUO Xuke, SI Nan.
Effects of PipeType Hidden Caverns on Tunnel
Lining Structure Under Strong Rainfall Conditions
[J]. Tunnel Construction, 2023, 43(11): 1831-1841.
|
[10] |
QIAO Xiong, YANG Xin.
Current Situation and Development of Causes of
Secondary Lining Crack in
Loess Tunnel and Countermeasures
[J]. Tunnel Construction, 2023, 43(10): 1657-1676.
|
[11] |
LI Lei, ZHU Chao, LIU Zhichun, AN Zhifei, LI Ning.
Construction Timing of Tunnel Secondary Lining in
Squeezing Rocks Based
on Statistics of Deformation Stabilization Time
[J]. Tunnel Construction, 2023, 43(1): 17-26.
|
[12] |
HUANG Mingli, JIANG Bo, WANG Chenglin, GUAN Qiang.
FullScale Model Tests on Water Pressure
Resistance of Karst Tunnel Lining Structure: a Case
Study of New Yuanliangshan Tunnel
[J]. Tunnel Construction, 2022, 42(S1): 48-55.
|
[13] |
ZHANG Zhigang, WU Ben, CHEN Jian, WU Chenglong, LIU Jiajun, LI Jinhui.
Effect of HeavyHaul Train on Bearing Capacity
of Cracked Tunnel Lining
[J]. Tunnel Construction, 2022, 42(S1): 56-65.
|
[14] |
ZHANG Wenjun, NIU Rongjian, QI Jianbing, ZHANG Chi, ZHANG Gaole, HE Lichao, LYU Jirui.
Impact of Jack Thrust on Force and Deformation of
Segment Linings for ShallowBuried
Shield Tunnel with Super Large Diameter
[J]. Tunnel Construction, 2022, 42(S1): 66-78.
|
[15] |
WANG Wanping, HUANG Hong, XU Ping.
Impact of Lining Support Cancellation for #1 Inclined Shaft
of Qinling Tiantaishan Tunnel
[J]. Tunnel Construction, 2022, 42(S1): 79-84.
|