[1] |
GENG Tianshuang, ZHANG Jing, ZHAO Jiling, YANG Ping, HE Wenlong.
Metro Jet System and Horizontal Freezing Construction
at Zhongsheng Station of Nanjing
Metro Line 7 Closely Crossing Underneath an Operation Station
[J]. Tunnel Construction, 2024, 44(1): 172-180.
|
[2] |
CHEN Kunyang, CHEN Xiangsheng, WANG Lei, YANG Wensheng, WU Huanyu, DUAN Huanbo.
Greenhouse Gas Emissions of Open
[J]. Tunnel Construction, 2023, 43(S1): 189-197.
|
[3] |
LIU Dun .
Application of Shield Receiving in Ultra-Deep
Foundation Pit Without Main Structure:
A Case Study of Dashadong Station of Gungzhou Metro Line 7
[J]. Tunnel Construction, 2023, 43(S1): 506-513.
|
[4] |
ZHOU Zhihui, SUN Bo.
Research on Key Technology of Prefabricated Metro -Station
with Internal Support System
[J]. Tunnel Construction, 2023, 43(S1): 464-472.
|
[5] |
QIN Zhengyang, AN Bin.
Mounting Technology for Steel Brace in Deep Foundation
Pit of Metro Station
Constructed by Semi-Cover Excavation Method: A Case Study
on Liuyanjing Station of Metro Line 3 in
Nanchang, China
[J]. Tunnel Construction, 2023, 43(S1): 407-415.
|
[6] |
CHEN Xiangsheng, WANG Lei, YANG Wensheng, SU Dong, WU Yongzhao, LIU Shuya.
Construction Scheme and Mechanical Properties of a
Prefabricated Metro Station Constructed by TwinTube Closely Spaced PipeJacking Method
[J]. Tunnel Construction, 2023, 43(7): 1089-1098.
|
[7] |
DONG Lipeng, YANG Shannan, LIU Zhiwei.
Research and Application of PipeRoof
Support Technology for Mined Metro Stations with UltraShallowBuried PipeRoof Cover Method:
a
Case Study of Ping′anli Station of Beijing Metro Line
19
[J]. Tunnel Construction, 2023, 43(2): 305-315.
|
[8] |
CAO Wufu, SHAO Xiaokang, LIU Zhe, YING Sheng, DONG Lipeng, JIANG Yusheng, YANG Zhiyong.
Comparative Analysis of Arrangement Modes of Tearing
Cutters for Earth
Pressure Balance Shield Tunneling in Cobble Stratum
[J]. Tunnel Construction, 2023, 43(10): 1788-1794.
|
[9] |
LI Fangbao, LONG Xi′an.
Deformation Characteristics and Applicability Analysis
of Support Structure for Metro Deep Foundation Pit in Soft
Soil in Foshan Area, China
[J]. Tunnel Construction, 2022, 42(S2): 294-304.
|
[10] |
SUN Daoguang, LI Jin, LI Bo, WANG Chen.
Key Technologies of Integrated Design for MultiSpeciality
of Metro Station with Prefabricated Underground
Structure
[J]. Tunnel Construction, 2022, 42(S2): 312-319.
|
[11] |
WU Chenggang, LI Mengting, PENG Zhiyong.
Crosssection Structure Selection of
Prefabricated Station in Shenzhen Metro Line 16
[J]. Tunnel Construction, 2022, 42(S2): 320-327.
|
[12] |
HUANG Hanxiao, WEI Liangwen, YAN Yuxin.
Integrated Construction Scheme of Municipal Bridges
and Metro Stations Considering Geological
Condition: a Case of University City South Station in Chongqing
[J]. Tunnel Construction, 2022, 42(S2): 345-351.
|
[13] |
ZHENG Ligang, CHANG Longfei, JIANG Hua, JIANG Yusheng.
Stress Characteristics of ConcreteFilled
Steel Tubular Column and Surface Deformation in PileBeamArch
Station with Different RiseSpan Ratios of Arch:
a Case Study of
Xiangheyuan Station on Beijing Metro Line 17
[J]. Tunnel Construction, 2022, 42(S1): 174-182.
|
[14] |
LI Xia, YANG Xiuren.
Comparative Analysis of Internal Forces of
Prefabricated and CastinPlace Metro Station Structures under Horizontal Earthquake
[J]. Tunnel Construction, 2022, 42(S1): 147-154.
|
[15] |
ZHU Yalin, ZHANG Bin, SHI Ming, LIU Jianjun, WANG Yixian.
Influence of Partitioned Excavation of Deep Narrow
Foundation Pit on Settlement of Neighboring Buildings
in Soft Soil Area
[J]. Tunnel Construction, 2022, 42(S1): 166-173.
|