ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2012, Vol. 32 ›› Issue (2): 164-168.DOI: 10.3973/j.issn.1672-741X.2012.02.007

• wenzhang • Previous Articles     Next Articles

Causes for Water Inflow/Bursting in Tunneling and Its Prediction Methods

SHE Linhui   

  1. (China Railway Tunnel Survey & Design Institute Co. Ltd., Tianjin 300133, China)
  • Received:2011-12-19 Revised:2012-01-29 Online:2012-04-20 Published:2012-05-03

Abstract: Water inflow/bursting is one of the common disasters when tunneling under complex geological conditions, which may jeopardize the construction safety and the construction schedule. The causes and possibility of water inflow/bursting are analyzed in terms of the feeding, flowing, storing and pressure of the ground water, so as to accurately predict the water inflow/bursting in tunneling. Case study is made on the water inflow/bursting of several tunnels. Some items that may be ignored in geological investigation and prediction are listed on basis of theoretical analysis and engineering practice, so as to attract more attention.

Key words: tunnel, water inflow/bursting, ground water, prediction, feeding, flowing path, water pressure