| [1] |
ZHANG Xiaoyan, TANG Jinyi, LI Qiang, MENG Lingfeng, LI Hongsen.
Mechanical Properties and Failure Mechanism of Recycled Concrete Prepared From Shield Tunnel Muck
[J]. Tunnel Construction, 2026, 46(S1): 186-195.
|
| [2] |
ZHANG Hongjun, ZHAO Jiawei, WANG Shuwang, SONG Zhanping, XU Hong, DONG Zhiwei, HU Ruoqi.
Comparative Life Cycle Assessment of Carbon Emissions and Environmental Impacts From U-Shaped Shield Tunneling and Cut-and-Cover Construction of Shallow-Buried Utility Tunnels: A Case Study of EA4 Bid Section Project in Xiong’an New Area
[J]. Tunnel Construction, 2026, 46(9): 1885-1903.
|
| [3] |
LIU Huan, ZHAO Wen, LI Jialong, BAI Qian, WANG Xin, YANG Qinghai.
Compression and Shear Properties of Foam-Conditioned Soil for Earth Pressure Balance Shield in a Fully Weathered Granite Stratum
[J]. Tunnel Construction, 2026, 46(3): 620-630.
|
| [4] |
ZHANG Junru, CHEN Pengtao, WANG Lichuan, WANG Wen, HE Weiguo, JIANG Xinqiang, HUANG Linxiang, PAN Tong.
A Support Parameter Optimization Method for Arch-Cover Method of Mined Metro Stations Based on Displacement Prediction
[J]. Tunnel Construction, 2026, 46(2): 260-272.
|
| [5] |
YANG Jian, WU Jiaming, DAI Linfabao, TIAN Li, LIU Xiuguo, SUN Jie, SUN Wenhao.
Deep-Learning-Based Intelligent Design Method and Application of Lining for High-Speed Railway Tunnels Using Mining Method
[J]. Tunnel Construction, 2025, 45(9): 1742-1755.
|
| [6] |
SONG Chaoye, LIU Wenjun, HE Weiguo, YU Yong, LYU Shuqing.
Key Technologies for Design of Pearl River Estuary Subsea Tunnel of Shenzhen-Jiangmen Railway
[J]. Tunnel Construction, 2025, 45(8): 1561-1576.
|
| [7] |
GAO Guangyi, LI Bokai, ZHAO Shuang, XU Qipeng, ZHU Zhijing.
Advance Grouting Reinforcement Technology for Ultra-High-Pressure Water-Rich Granite Alteration Zones: A Case Study of Gaoligongshan Tunnel Exit on Dali-Ruili Railway
[J]. Tunnel Construction, 2025, 45(8): 1590-1601.
|
| [8] |
YANG Jichen, LIU Wei, YANG Jiawen, HE Shaoyun, LIANG Jiaxin.
Development and Performance Study of a Novel Shield Tail Synchronous Grouting Material Using Granite Manufactured Sand
[J]. Tunnel Construction, 2025, 45(7): 1317-1327.
|
| [9] |
GUO Xiansuo.
Construction Technology of Prefabricated Inverted Arch in Single-Track
Railway Tunnels by Mining Method
[J]. Tunnel Construction, 2025, 45(3): 623-635.
|
| [10] |
LI Zhiguo, ZHUO Yue, GU Qingtian, XU Qipeng, GAO Guangyi, LI Guangyue, ZHAO Shuang, SHI Jiyao.
Advance Pregrouting Technology for Tunnels in High-Pressure Water-Rich Granite Altered Zone
[J]. Tunnel Construction, 2025, 45(12): 2352-2363.
|
| [11] |
ZHENG Jiayan, LAN Pengbo, LIU Haijing, LU Zhan, YANG Lijuan, CHEN Dingjia.
Analytical Solution of Bending Moment and Section Parameters of Square Arched Corrugated Steel Utility Tunnel
[J]. Tunnel Construction, 2024, 44(S1): 167-178.
|
| [12] |
HUANG Shuhua, ZHENG Zhenji, SHENG Jian, XIE Dianyan, ZHANG Liang, CHEN Xiangsheng, SU Dong.
Comparative Study on Construction Schemes for Connecting Channel of Underwater Super-Large Diameter Shield Tunnel: A Case Study on Haizhuwan Tunnel in Guangzhou, China
[J]. Tunnel Construction, 2024, 44(S1): 408-417.
|
| [13] |
LI Pengfei, LI Ze, GE Chenhe, GUO Fei.
Deformation Characteristics and Redundancy Analysis of
Deep Foundation Pit Excavation in Metro Station Using
Covering TopDown Method in Sandy Stratum
[J]. Tunnel Construction, 2023, 43(S1): 98-108.
|
| [14] |
QIN Zhengyang, AN Bin.
Mounting Technology for Steel Brace in Deep Foundation
Pit of Metro Station
Constructed by Semi-Cover Excavation Method: A Case Study
on Liuyanjing Station of Metro Line 3 in
Nanchang, China
[J]. Tunnel Construction, 2023, 43(S1): 407-415.
|
| [15] |
DONG Lipeng, YANG Shannan, LIU Zhiwei.
Research and Application of PipeRoof
Support Technology for Mined Metro Stations with UltraShallowBuried PipeRoof Cover Method:
a
Case Study of Ping′anli Station of Beijing Metro Line
19
[J]. Tunnel Construction, 2023, 43(2): 305-315.
|