[1] |
CHEN Jian, XUE Feng, SU Xiuting, LU Yao, LIU Tao.
Key Technologies of Cutterhead Configuration and
Cutter Replacement for Large diameter
Shield under High Water Pressure
[J]. Tunnel Construction, 2020, 40(7): 1057-1065.
|
[2] |
ZHAO Yong, YU Zufa, CAI Jue, LYU Gang, LIU Jianyou, YUE Ling.
Design Concept and Implementation Path for Badaling
Great Wall Station of BeijingZhangjiakou Highspeed Railway
[J]. Tunnel Construction, 2020, 40(7): 929-940.
|
[3] |
HAN Huaxuan.
Study on Selection of Tunnel Design Standard for JakartaBandung Highspeed Railway Project in
Indonesia
[J]. Tunnel Construction, 2020, 40(6): 845-858.
|
[4] |
HUANG Wei.
Optimization Design of Segmental Structure of Large
Crosssection Rectangular Pipe jacking Tunnel
[J]. Tunnel Construction, 2020, 40(6): 859-867.
|
[5] |
LI Yabo, LI Jing.
Design of Lshaped Joint Concrete Lining
Formwork Trolley
[J]. Tunnel Construction, 2020, 40(6): 898-904.
|
[6] |
TAO Liangliang, ZHANG Yimin, LIU Zhenhan, FU Xiaokang, ZHOU Xiaohan, ZENG Yanhua.
Numerical Study on Influence of Ambient Pressure on
Maximum Temperature of Tunnel
Crown without Consideration of Longitudinal Velocity
[J]. Tunnel Construction, 2020, 40(6): 827-832.
|
[7] |
CHEN Xianzhi, CHENG Yong, YANG Xiaolong, LIU Fei, HU Qinxin, LIU Pengfei.
Experimental Study on Ground Conditioning Technology for EPB Shield Boring in Water-rich Gravel Stratum
[J]. Tunnel Construction, 2020, 40(5): 636-643.
|
[8] |
ZHOU Peng, GAO Jincang, LI Lei, ZHENG Fei, DAI Yong.
Temporal and Spatial Characteristics of Large Deformation of Unsymmetrically-pressured Loess Tunnel Passing through Scarp Terrain
[J]. Tunnel Construction, 2020, 40(5): 652-659.
|
[9] |
ZHANG Xuan, HEI Shiqiang, DAI Shiwei.
Study on Upper Limit of Surrounding Rock Pressure of Shallow Tunnel Based on Variational Principle
[J]. Tunnel Construction, 2020, 40(5): 679-685.
|
[10] |
宋超业, 贺维国, 吴钇君.
高水压过海盾构隧道建设关键技术可行性初探
[J]. Tunnel Construction, 2020, 40(5): 717-726.
|
[11] |
WANG Famin, SUN Zhenchuan, ZHANG Lianghui, LI Fengyuan, ZHANG Bing, WANG Guo′an.
Design of Super-large Diameter Slurry Shield Used in Shantou Bay Tunnel and Construction Countermeasures for Unfavorable Geology
[J]. Tunnel Construction, 2020, 40(5): 735-746.
|
[12] |
JIN Yuelang, DING Wenqi, XIAO Mingqing, SUN Wenhao, WU Weifeng, YE Meixi, TU Xinbin.
Experimental Research on Sealing Behavior of Segmental Joints of
Sutong GIL Utility Tunnel under Ultra-high Water Pressure
[J]. Tunnel Construction, 2020, 40(4): 538-544.
|
[13] |
FANG Zhongyu.
Design and Application of Online Temperature Monitoring System for
Cutterhead of Large-diameter Slurry Shield under Atmospheric Pressure:
a Case Study on Wangjiang Road River-crossing Tunnel Project in Hangzhou
[J]. Tunnel Construction, 2020, 40(4): 586-590.
|
[14] |
CHEN Junhao, CHEN Bijian, ZHUANG Yan, WANG Lexiao, LIU Maojun.
Comparison of Vertical Bearing Capacity of Tunnel Grille Arch Frame
with Different Cross-section Shapes
[J]. Tunnel Construction, 2020, 40(3): 364-370.
|
[15] |
SUN Zhihong, WANG Ning.
Experimental Study and Analysis of Leakage Monitoring of Shield
Tail Sealing System Based on Fiber Bragg Grating Sensor
[J]. Tunnel Construction, 2020, 40(3): 346-351.
|