ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2012, Vol. 32 ›› Issue (3): 366-371.DOI: 10.3973/j.issn.1672-741X.2012.03.019

• wenzhang • Previous Articles     Next Articles

Monitoring Technologies and Warning Management for Construction ofMountaincrossing Tunnels

CHEN Xiaoxiong   

  1. (Hubei Communications Technical College, Wuhan 430079, China)
  • Received:2012-03-15 Revised:2012-04-26 Online:2012-06-20 Published:2012-07-09

Abstract: Problems in monitoring are analyzed. Monitoring process control is studied. Criterion and technical key points of monitoring process control are proposed. Conclusions drawn are as follows: 1) Only when the monitoring process is well controlled and the monitoring data are well compared to the actual performance, can accurate and timely warning be given. 2) Implementing 6 monitoring systems is an effective way to obtain reliable monitoring data. 3) The monitoring efficiency can be improved if the precision requirement for the monitoring instruments and devices is properly lowered and the monitoring is well coordinated with the construction process.

Key words: tunnel construction, monitoring, process control, technical key points