| [1] |
ZOU Yi, ZHU Bitang, LUO Ruping, OUYANG Hua, WANG Jiahao, LUO Le.
Experimental Study on Mechanical Characteristics of Heterogeneous Grouting in Water-Rich Fault Fracture Zones
[J]. Tunnel Construction, 2026, 46(4): 741-750.
|
| [2] |
YI Xuanxuan, PAN Ting, DU Zhigang, HE Shiming.
Experimental Study on Optimization of Fatigue-Sensitive Zones for Extra-Long Urban Tunnels Based on Simulated Driving
[J]. Tunnel Construction, 2026, 46(2): 310-321.
|
| [3] |
PAN Yue, XIE Tao, LIU Yongsheng, GAO Pan, YANG Zhenxing.
Intelligent Identification and Prevention of TBM Jamming in Hard-Rock Fractured Zones
[J]. Tunnel Construction, 2026, 46(2): 383-393.
|
| [4] |
ZHOU Xiaomin, LIU Yong, MA Wenzhu, SONG Yixiang, LIU Shujie, ZHANG Song, ZHANG Jiwei.
Elastoplastic Analysis and Ground Reaction Curve of Pregrouting Reinforced Surrounding Rocks in Deep Tunnels With High Water Pressure
[J]. Tunnel Construction, 2026, 46(1): 35-45.
|
| [5] |
DENG Jia, ZHANG Qingsong, LIU Yanan, LIU Yankai.
Corrosion Resistance of Curtain Grouting Reinforcement Rings in Submarine Tunnels
[J]. Tunnel Construction, 2025, 45(9): 1664-1683.
|
| [6] |
YANG Jian, WU Jiaming, DAI Linfabao, TIAN Li, LIU Xiuguo, SUN Jie, SUN Wenhao.
Deep-Learning-Based Intelligent Design Method and Application of Lining for High-Speed Railway Tunnels Using Mining Method
[J]. Tunnel Construction, 2025, 45(9): 1742-1755.
|
| [7] |
PEI Chao, LIU Yanping.
Optimization of Hydration Heat Control Scheme for Full-Section Casting of Immersed Tube Tunnels Based on Orthogonal Experiments
[J]. Tunnel Construction, 2025, 45(8): 1469-1482.
|
| [8] |
SONG Chaoye, LIU Wenjun, HE Weiguo, YU Yong, LYU Shuqing.
Key Technologies for Design of Pearl River Estuary Subsea Tunnel of Shenzhen-Jiangmen Railway
[J]. Tunnel Construction, 2025, 45(8): 1561-1576.
|
| [9] |
GAO Guangyi, LI Bokai, ZHAO Shuang, XU Qipeng, ZHU Zhijing.
Advance Grouting Reinforcement Technology for Ultra-High-Pressure Water-Rich Granite Alteration Zones: A Case Study of Gaoligongshan Tunnel Exit on Dali-Ruili Railway
[J]. Tunnel Construction, 2025, 45(8): 1590-1601.
|
| [10] |
GUO Xiansuo.
Construction Technology of Prefabricated Inverted Arch in Single-Track
Railway Tunnels by Mining Method
[J]. Tunnel Construction, 2025, 45(3): 623-635.
|
| [11] |
WU Senyang, CHEN Xiang, CHEN Peng, ZENG Yuhan.
Construction Risk Control
of Large-Section, Small-Spacing Rectangular Pipe-Jacking Metro Stations: A Case Study of Haibang
Metro Station in Guangzhou, China
[J]. Tunnel Construction, 2025, 45(2): 382-391.
|
| [12] |
NI Jiaze, LI Xiang, ZHANG Jinzhang, HUANG Hongwei.
Structural Safety Risk Analysis of Subsea Tunnels Crossing Fault Zones in Jiaozhou Bay Second Subsea Tunnel
[J]. Tunnel Construction, 2025, 45(12): 2287-2297.
|
| [13] |
LYU Haimin, LIU Xiang, HAN Kaihang, CHEN Xiangsheng, DONG Zijun, ZHANG Jiaxuan.
Assessment Methods and Perspectives on Extreme Rainfall-Induced Flood Risks in Urban Underground Spaces
[J]. Tunnel Construction, 2025, 45(11): 1981-1993.
|
| [14] |
WANG Xuejian, ZHANG Yuyu, JIANG Sili, WANG Jiayuan.
Risk Management and Platform Implementation of Shield Tunneling in Metro Engineering Based on Digital Twin
[J]. Tunnel Construction, 2025, 45(11): 2100-2116.
|
| [15] |
WANG Jie, CHENG Guolong, ZHOU Bing, HU Wei, TAN Houjun, XIE Jianhong.
Safety Risk Evaluation of
Long-Distance Small-Diameter Tunnel Bored by Tunnel Boring
Machine
[J]. Tunnel Construction, 2024, 44(S2): 211-223.
|