ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2012, Vol. 32 ›› Issue (5): 626-630.DOI: 10.3973/j.issn.1672-741X.2012.05.003

• wenzhang • Previous Articles     Next Articles

Study on Influence of Water Level Fluctuation on Shieldbored Tunnel

LI Chunliang1, WANG Yong2, ZHANG Wei3   

  1. (1.School of Communication Science & Engineering, Jilin Architectural and Civil Engineering Institute,  Changchun 130118, China; 2. Jilin Highway Administration Bureau, Changchun 130021, China;  3. Capital Construction Department of the Second Hospital of Jilin University, Changchun 130021, China)
  • Received:2012-07-16 Revised:2012-09-06 Online:2012-10-20 Published:2012-10-30

Abstract: A finite element model of shieldbored tunnel structure is established, so as to study the influence of water level fluctuation on shieldbored tunnel. The deformation of the tunnel and the ground under different water levels can be predicted and the displacement rules of the shieldbored tunnel under different water levels can be revealed by means of the model.The study results show that: 1) Rebound deformation will occur to the shallow soil layers at the ground surface when the water level rises. The rebound value of ground under which shieldbored tunnel exists is smaller than that of ground under which no shieldbored tunnel exists. 2) Vertical displacement of the tunnel structure and lateral displacement of the sidewall will happen when the ground water level rises from the invert to the crown. The higher the ground water level, the bigger the displacement value. 

Key words: shield, tunnel, ground water, water level fluctuation, influence, study