Case Study on Blasting Demolition of Waterstopping Wall of Xiangshan Tunnel

ZHAO Dongbo, LI Hongjun   

  1. (China Railway Tunnel Group Co., Ltd., Luoyang 471009, Henan, China)
  • Received:2012-04-09 Revised:2012-04-23 Online:2012-10-20 Published:2012-10-30

Abstract: The thicknesses of the concrete waterstopping wall and antishearing wall of Xiangshan tunnel are 7 m and 5 m respectively. Countermeasures, including reserving protection layer, drilling vibrationreducing hole, nonblasting pilot heading, strict control of the charging quantity of each interval and rational blasting parameter design, are taken in order to demolish the waterstopping wall and the antishearing wall and to ensure the safety of the lining. In the end, good result has been achieved.

Key words: tunnel, waterstopping wall, blasting demolition, vibrationreducing hole, pilot heading, nonblasting excavation