| [1] |
YU Li, GUO Xiaohan, WANG Mingnian, LIU Yuan, LI Junqi.
Design of Evacuation and Rescue in Underwater Railway Shield Tunnels Based on Evacuation Psychology and operational safety
[J]. Tunnel Construction, 2026, 46(S1): 397-405.
|
| [2] |
LI Jiaqi, WANG Leming, MA Zhifu, MENG Qingyu, YANG Hao, LIU Zhuangzhuang, WANG Pengle.
Key Technologies for Designing Prefabricated Ultra-Deep Shafts in Weak and Water-Rich Strata of Yangtze River Floodplain
[J]. Tunnel Construction, 2026, 46(5): 1073-1084.
|
| [3] |
XU Guangyi, QI Zhichong, ZHAO Zihui, JIA Tao, LI Ming, WU Hao, GENG Qi.
Design and Testing of a Cone-Shaped Cutterhead Based on Boring Method for Enlarged-Diameter Vertical Shafts
[J]. Tunnel Construction, 2026, 46(1): 194-203.
|
| [4] |
CAI Caiwu.
Mechanical Effects of Vertical Shaft Construction in Intercity Railways Using Vertical Machinery Method
[J]. Tunnel Construction, 2025, 45(9): 1640-1648.
|
| [5] |
PENG Tao, TONG Yan, ZHANG Guangli, GONG Yanfeng, CHEN Zheng, GUO Yizhong, MAO Qin, LYU Gangyu, HUANG Weihao, DAI Baolian.
Field Experiments for Natural Smoke Exhaust Through
Vertical Shaft of Urban Road Tunnel Under Fire
Condition in Summer
[J]. Tunnel Construction, 2023, 43(7): 1170-1179.
|
| [6] |
LIU Zaizheng, KE Wei, YAO Man, JI Zhiyong, WEN Zhongbao, YANG Xu.
Structural Design and Application of Cutterhead for
Graded Excavation of FullFace
Vertical Shaft Boring Machine with SuperLarge Diameter
[J]. Tunnel Construction, 2023, 43(6): 1057-1064.
|
| [7] |
BAO Heli, JIANG Hong.
Structural Design of Prefabricated Concrete Segment
for Assembled Shaft
[J]. Tunnel Construction, 2022, 42(S1): 376-381.
|
| [8] |
HUA Nan, ZHAI Zhiguo, LIU Liu.
Construction Technology for Repairing Damaged Segment
of Shield Tunnel Adjacent to HighVoltage Power Tower
[J]. Tunnel Construction, 2022, 42(S1): 466-479.
|
| [9] |
HUANG Mingliang, ZHANG Zhenguang, XU Jie, JIANG Hong, BAO Heli, LIU Xian.
Measuring of Shaft Wall Stress in Caisson Construction
Process Based on Vertical Shaft Sinking Machine: a Case Study of
CaissonType Underground
Intelligent
Parking Garage Project in Nanjing, China
[J]. Tunnel Construction, 2022, 42(6): 1033-1043.
|
| [10] |
WANG Huanlong, LIU Jianbing, YANG Changyu, ZHU Tingyu.
Case Study of Water Control in a Deep and LargeDiameter
Vertical Railway Shaft in Granite and Analysis of Its
Efficiency
[J]. Tunnel Construction, 2021, 41(3): 402-410.
|
| [11] |
GAO Guangyi.
Water Gushing Treatment Technology for Deep and Large
Vertical Shafts of Railway in Waterrich Weathered
Granite: a Case Study on #1 Vertical Shaft of
Gaoligongshan Tunnel on DaliRuili Railway
[J]. Tunnel Construction, 2020, 40(S1): 358-363.
|
| [12] |
JIANG Fuqiang, WANG Zimao.
New Technology of Sliding Formwork Integral Construction for Lining Structure of Rectangular Vertical Shaft
[J]. Tunnel Construction, 2019, 39(S2): 379-384.
|
| [13] |
JIANG Xuepeng, WU Jindong.
Influence of Smoke Backlayering Flow of Vertical Ventilation Shaft in Urban Shallow Tunnels
[J]. Tunnel Construction, 2019, 39(3): 370-377.
|
| [14] |
TANG Xie, LIN Guojin, HE Jia, AN Junji, ZHOU Xionghua, ZHANG Rui.
New Construction Technology for Deep and Large Vertical Shaft in Micangshan Tunnel
[J]. Tunnel Construction, 2019, 39(2): 268-274.
|
| [15] |
CHENG Shouye.
Study and Application of Raiseboring Method for Deep Vertical Shaft of Railway Tunnel Construction:A Case Study of Dangjinshan Tunnel
[J]. Tunnel Construction, 2018, 38(9): 1560-1565.
|