Tunnel Construction ›› 2012, Vol. 32 ›› Issue (6): 843-848.DOI: 10.3973/j.issn.1672-741X.2012.06.017
• wenzhang • Previous Articles Next Articles
YANG Chao1, YUE Fengtian2
Received:
Revised:
Online:
Published:
Abstract: The 8 connection galleries of Yangtze Rivercrossing tunnel in Shanghai are constructed by freezing method. In the paper, analysis is made on the development rules of the thickness of frozen soil curtain, the average temperature of frozen soil and the temperature of excavation face, on basis of the results of monitoring made during freezing of No. 1 connection gallery. The disadvantages of the original freezing program are discussed and optimized freezing program is proposed. Numerical simulation is made on the development of the temperature field of the optimized freezing program. The freezing effect of the optimized freezing program is analyzed. The practice shows that the optimized freezing program has advantages such as large effective thickness of frozen soil curtain, low average temperature and high freezing efficiency. The study guarantees safe and economic freezing of the other 7 connection galleries.
Key words: design optimization, freezing method, monitoring, connecting gallery, Yangtze Rivercrossing tunnel in Shanghai
YANG Chao, YUE Fengtian. Study on Freezing in Construction of Connection Galleries of Yangtze Rivercrossing Tunnel in Shanghai[J]. Tunnel Construction, 2012, 32(6): 843-848.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2012.06.017
http://www.suidaojs.com/EN/Y2012/V32/I6/843
Study on Key Technologies and Application of Engineering Big Data Management Platform of Tunnel Boring Machine