ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2013, Vol. 33 ›› Issue (10): 815-819.DOI: 10.3973/j.issn.1672-741X.2013.10.003

Previous Articles     Next Articles

A Discussion on the Tunnel Transportation and Construction Methods  for the Taiwan Straitcrossing Tunnel

ZHANG Keqiang1, ZHAO Ali2, YANG Hao2   

  1. (1. Shaanxi Provincial Department of Water Resources, Xi’an 710000, Shaanxi, China;  2. Shaanxi Provincial Department of HangjiangWeihe Transfer Project, Xi’an 710004, Shaanxi, China)
  • Received:2013-05-23 Revised:2013-07-28 Online:2013-10-20 Published:2013-10-24

Abstract:

The possibility of using electric vehicles and the layout of the Taiwan straitcrossing tunnel are discussed. Some key controlling factors, including ventilation, transportation, equipment reliability and construction schedule of the TBM tunneling are analyzed. The conclusion is that an artificial island is necessary, considering the reliability of technologies and the necessary control over the construction schedule. Finally, a proposal on the function and structure of the artificial island is presented, as well as suggestions for further study.

Key words: Taiwan strait crossing tunnel, transportation model, electricalpowered car, artificial island proposal