ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2013, Vol. 33 ›› Issue (12): 1041-1047.DOI: 10.3973/j.issn.1672-741X.2013.12.011

Previous Articles     Next Articles

Separate Launching of Shield to Bore underneath Sensitive Buildings in Winter:Case Study on Shield Launching for Guloudajie StationShichahai Station Section on Line 8 of Beijing Metro

WANG Gang   

  1. (Tunnel Engineering Co., Ltd., China Railway 14th Bureau Group, Jinan 250002, Shandong, China)
  • Received:2013-09-05 Revised:2013-11-28 Online:2013-12-20 Published:2013-12-27

Abstract:

There are many difficulties in the shield launching for Metro tunnels in urban areas, such as difficulties related to limited site area, cold weather and sensitive buildings. During the launching of the shield for Guloudajie StationShichahai Station section on Line 8 of Beijing Metro, countermeasures, including separate shield launching, cutterhead opening ratio optimization, heat preservation, boring parameter control and accurate management, are taken. Due to the countermeasures mentioned above, successful shield launching has been achieved, the settlement of the sensitive buildings has been brought under effective control and the safety of the sensitive buildings has been guaranteed.

Key words: Beijing Metro, shield, winter, separate shield launching, construction technology