Technology for Methane Releasing in Shield Tunneling Through  Qiantang River Formation: Case Study on Line 1 of Hangzhou Metro

XU Guoqing1, YUE Fengtian2, WANG Hongqi3, ZHANG Ronghui3   

  1. (1. Anhui Provincial Communications Planning, Design and Research Institute, Hefei 230088, Anhui, China;  2. China University of Mining and Science, Xuzhou 221116, Jiangsu, China;  3. Shanghai Tunnel Engineering Co., Ltd., Shanghai 200082, China)
  • Received:2012-03-06 Revised:2013-02-01 Online:2013-03-20 Published:2013-03-23

Abstract:

Line 1 of Hangzhou Metro passes through Qiantang River formation, which contains large amount of methane. Therefore, there is great risk in shield tunneling. The methane is mainly located at the junction between the silty clay and silty sand. Methane releasing trials are made so as to understand the occurrence characteristics of the methane and, in turn, to make preparations to take countermeasures. During the shield tunneling, no methane outburst occurs, which demonstrates that the methane releasing is effective.

Key words: Line 1 of Hangzhou Metro, methane, occurrence, release, blowout