Key Technologies for Design and Construction of Shallowcovered Forkedsection of Jiaozhou Bay Tunnel

LIU Peng   

  1. (China Railway Tunnel Survey & Design Institute Co.,Ltd.,Tianjin 300133, China)
  • Received:2013-03-12 Revised:2013-05-01 Online:2013-06-20 Published:2013-07-25

Abstract:

A forked section is arranged in Jiaozhou Bay tunnel. Due to the shallow cover, poor geological conditions and complex ground surface environment of the forkedsection of the tunnel, there are great difficulties in the design and construction of the forkedsection. The range of the smallspaced tunnel section is determined by means of engineering analogy and numerical simulation. Concrete filling and tie bolts are adopted to reinforce the rock pillar of the smallspaced tunnel section. Pregrouting, primary support strengthening and bench excavating method are adopted for the large crosssection tunnel section. Microvibration blasting technology is adopted during the construction. In the end, rapid construction is achieved for the forkedsection. The monitoring results show that the support parameters, construction technologies and construction program adopted are rational and reliable.

Key words: Jiaozhou Bay tunnel, forked tunnel, smallspaced tunnel, large crosssection tunnel, rock pillar reinforcement, microvibration blasting, monitoring