| [1] |
ZHU Qikai, SHAO Zhili, TANG Shaojun, TENG Yingwei.
Axial Force Distribution of Concrete Supports in Servo Systems for Super-Large Foundation Pits
[J]. Tunnel Construction, 2026, 46(S1): 294-305.
|
| [2] |
ZHAO Wenxian, LIANG Rongzhu, KANG Cheng, LIU Lü, ZHOU Zheng, TU Shifang, GUO Changjiang.
Deformation Characteristics of Retaining Structures of Deep Foundation Pit of a Metro Station Under Large-Area Unbalanced Surcharge
[J]. Tunnel Construction, 2026, 46(S1): 336-347.
|
| [3] |
LI Dongni, CHEN Peng, XIONG Jianhui, XU Shunming.
A Microscopic Pedestrian Simulation Assessment Method for Renovation Stage of Metro Stations
[J]. Tunnel Construction, 2026, 46(S1): 436-442.
|
| [4] |
XI Chenglei, SHEN Yifei, GAO Zhangchao, JI Xiaotao, LIU Xingen, LIU Xuezeng.
Improved YOLOv11-Based Lining Crack Segmentation Model for Metro Tunnels
[J]. Tunnel Construction, 2026, 46(S1): 552-563.
|
| [5] |
YANG Chunshan, YU Zhiyuan, LI Yadong, LIN Zhiwei.
Mechanical Characteristics of Supporting Structures for Deep Foundation Pits of Immersed Tunnels With Limited Soil and Unilateral Water-Adjacent Cofferdams
[J]. Tunnel Construction, 2026, 46(9): 1990-2000.
|
| [6] |
YAN Xiao, ZHANG Yazhou, YAO Zhanhu, ZHANG Dongmei, ZHANG Lei, XU Mingyuan, ZHOU Wending, LIANG Yuqiang, LU Mingfei, LI Hui.
Comparison and Selection of Structural Schemes for Underground Shield Docking in High-Water-Pressure Saturated Sandy Stratum and Its Engineering Application
[J]. Tunnel Construction, 2026, 46(6): 1330-1341.
|
| [7] |
WANG Yanning, LI Taikai, MIN Xinhao.
State of the Art of Machine Learning in Tunnel Engineering
[J]. Tunnel Construction, 2026, 46(2): 233-245.
|
| [8] |
ZHANG Junru, CHEN Pengtao, WANG Lichuan, WANG Wen, HE Weiguo, JIANG Xinqiang, HUANG Linxiang, PAN Tong.
A Support Parameter Optimization Method for Arch-Cover Method of Mined Metro Stations Based on Displacement Prediction
[J]. Tunnel Construction, 2026, 46(2): 260-272.
|
| [9] |
ZHAO Jingwei, LI Haoqi, SUN Yu.
Evaluation of Spatial Integration in Metro Station Areas From Perspective of Urban Renewal: A Case Study of Shinan District, Qingdao, China
[J]. Tunnel Construction, 2026, 46(1): 46-59.
|
| [10] |
LEI Mingfeng, LI Changwan, YANG Pengliang, JIA Chaojun, LI Chuitian.
Impact Zoning of Construction Disturbance on Nearby Existing Damaged BuildingsInduced by Foundation Pit of a Metro Station Based on Extended Finite Element Method and Response Surface Method
[J]. Tunnel Construction, 2026, 46(1): 69-79.
|
| [11] |
BAI Qian, LI Zheng, ZHAO Wen, PENG Zhipeng.
Impact of Small Pipe-Roof-Top Slab Method Support Parameters in Metro Stations on Surface Settlement
[J]. Tunnel Construction, 2026, 46(1): 103-112.
|
| [12] |
FENG Jimeng, LI Yifei, YAO Shiyu, WANG Shengtao, ZHANG Junru, SUN Ning.
Interactive Influence and Deformation Control of Construction Timing in Pile-Beam-Arch Method Metro Stations With Tunnel-Before-Station Sequence
[J]. Tunnel Construction, 2026, 46(1): 183-193.
|
| [13] |
ZHANG Zhiguo, WAN Qimeng, LI Junjie, NI Yin, JIA Haoran, WEI Jian.
Impact of Deep Foundation Pit Excavation on Existing Metro Stations in Rheological Soft Strata and Reinforcement Effects: A Case Study of Shanghai Jinqiao Metro Over-Track Project
[J]. Tunnel Construction, 2025, 45(S2): 97-106.
|
| [14] |
FANG Qian, YOU Qizhao, WANG Jianchen, WANG Gan, KE Chengjian, RU Zhenhua.
Deformation of Existing Metro Structures Induced by Newly Built Metro Undercrossing: A Case Study of 18 Newly Built Metro Projects in Beijing
[J]. Tunnel Construction, 2025, 45(S2): 125-139.
|
| [15] |
LIU Xiaogang, SONG Yi, GUO Yanhai, YAO Xilei.
Design of Common Structure Section Between Jinan-Binzhou High-Speed Railway Tunnel and Airport
[J]. Tunnel Construction, 2025, 45(S2): 280-288.
|