ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2014, Vol. 34 ›› Issue (1): 48-52.DOI: 10.3973/j.issn.1672-741X.2014.01.008
Previous Articles Next Articles
XI Jun1, SUN Yuanguang2
Received:
Revised:
Online:
Published:
Abstract:
By reviewing the process of the planning of Suzhou urban rail transit network, qualitative and quantitative analyses are made on the 2020 planning network. After local optimization of line 3 and line 7 and by transposing line 3 and line 5 in the Industrial Park, a new plan of line 3 and line 5 is proposed. The analysis on the project implementation and the comparison of the passenger flow tests indicate that the new plan has better network function. The new line 3 combined with line 8 can act as a loop line.
Key words: Suzhou urban rail transit, network optimization, line transposition, combined loop line, passenger flow benefits
XI Jun, SUN Yuanguang. Analysis on Transposition of Line 3 and Line 5 of Suzhou Urban Rail Transit in the Industrial Park[J]. Tunnel Construction, 2014, 34(1): 48-52.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2014.01.008
http://www.suidaojs.com/EN/Y2014/V34/I1/48