Tunnel Construction ›› 2014, Vol. 34 ›› Issue (1): 48-52.DOI: 10.3973/j.issn.1672-741X.2014.01.008

Previous Articles     Next Articles

Analysis on Transposition of Line 3 and Line 5 of Suzhou Urban Rail Transit in the Industrial Park

XI Jun1, SUN Yuanguang2   

  1. (1. Suzhou Rail Transit Group Limited Company, Suzhou 215004, Jiangsu, China; 2. Guangzhou Metro Design & Research Institute Co., Ltd., Guangzhou 510010, Guangdong, China)
  • Received:2013-07-13 Revised:2013-11-20 Online:2014-01-20 Published:2014-01-21

Abstract:

By reviewing the process of the planning of Suzhou urban rail transit network, qualitative and quantitative analyses are made on the 2020 planning network. After local optimization of line 3 and line 7 and by transposing line 3 and line 5 in the Industrial Park, a new plan of line 3 and line 5 is proposed. The analysis on the project implementation and the comparison of the passenger flow tests indicate that the new plan has better network function. The new line 3 combined with line 8 can act as a loop line.

Key words: Suzhou urban rail transit, network optimization, line transposition, combined loop line, passenger flow benefits