Analysis on and Countermeasures for Unbalanced Forces on Cutterhead of Largediameter Shield
HAN Weifeng1,2, ZHOU Jianjun1,2, LI Fengyuan1,2
(1. State Key Laboratory of Shield Machine and Boring Technology, Zhengzhou 450001, Henan, China; 2. China Railway Tunnel Group Co., Ltd., Luoyang 471009, Henan, China)
HAN Weifeng, ZHOU Jianjun,LI Fengyuan. Analysis on and Countermeasures for Unbalanced Forces on Cutterhead of Largediameter Shield[J]. Tunnel Construction, 2014, 34(1): 78-82.