Case Study on Transverse Ground Surface Settlement of Land Section of Shiziyang Tunnel Bored by Shield

YANG Yandong1, 2, CHEN Kui1, 2, LI Fengyuan1, 2, ZHOU Jianjun1, 2   

  1. (1 State Key Laboratory of Shield Machine and Boring Technology, Zhengzhou 450001, Henan, China; 2 China Railway Tunnel Group Co, Ltd, Luoyang 471009, Henan, China)
  • Received:2014-07-29 Revised:2014-09-09 Online:2014-12-20 Published:2014-12-17

Abstract:

In this paper, the transverse ground surface settlement of DIK42+660 crosssection of land section of Shiziyang tunnel induced by shield boring is calculated by means of Peck formula The ground is numerically simulated by means of ANSYS finite element model, and the transverse ground surface settlement values are obtained from the numerical simulation results The transverse ground surface settlement values obtained by means of theoretical analysis and numerical simulation respectively are estimated by means of comparing them with the measured values The paper can provide reference for the prediction of ground surface settlement of shieldbored tunnel of similar projects in the future

Key words: shieldbored tunnel, ground surface settlement, theoretical analysis, numerical simulation, field validation