Tunnel Construction ›› 2014, Vol. 34 ›› Issue (2): 101-106.DOI: 10.3973/j.issn.1672-741X.2014.02.002

Previous Articles     Next Articles

Study on Ground Penetrating Shieldbored Tunnel Calculation Parameters in Modified Routine Method

ZHANG Yinping   

  1. (Shanghai Urban Construction Design & Research Institute, Shanghai 200125, China)
  • Received:2013-12-05 Revised:2014-01-23 Online:2014-02-10 Published:2014-02-27

Abstract:

Modified routine method is widely used in the calculation of the internal force of shieldbored tunnels, and the calculation parameters are generally selected according to the experience. In the paper, the key calculation parameters of ground penetrating shieldbored tunnel in the modified routine method, i.e., the stiffness reduction ratio (η) and the moment release ratio (ξ), are analyzed on basis of shellspring model, considering the nonlinear relationship between the bending stiffness and axial bending moment of the segment joints. Conclusions drawn are as follows: 1) For shieldbored tunnel with supershallow overburden, the minimum value in the specified range of specifications should be adopted for stiffness reduction ratio (η) and the maximum value should be adopted for the moment release ratio (ξ); 2) When the top of the tunnel is above the ground surface, value 1 should be adopted conservatively.

Key words: ground penetrating shieldbored tunnel, modified routine method, stiffness reduction ratio, moment release ratio