ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2014, Vol. 34 ›› Issue (3): 179-187.DOI: 10.3973/j.issn.1672-741X.2014.03.001
Next Articles
WANG Mengshu
Received:
Online:
Published:
Abstract:
The stateofart of tunneling by TBM/shield in China, including underwater tunneling by shield, Metro tunneling by shield and mountaincrossing tunneling by TBM, is analyzed briefly. The problems in the tunneling by TBM/shield in China are analyzed on basis of typical case histories: 1) The diameter of the shields for underwater highway tunnels is too large; 2) The durability of the single segment lining shell is inadequate; 3) Shield TBM has many limitations; 4) EPB shield is not applicable for all cases; 5) The elevation of the route of some tunnels is irrational; 6) Some projects suffer from irrational construction schedule, irrational construction cost, irrational construction contract and irrational construction scheme. Regarding the aforementioned problems, the following proposals are made: 1) In general cases, the diameter of the shields for underwater highway tunnels should not be more than 12 m; 2) Castinsitu secondary lining should be added to form composite lining structure; 3) Shield TBM should be cancelled, while open TBM should be promoted; 4) Slurry shield, EPB shield and open shield should be considered in shield type selection; 5) The tunneling route should not be placed along the interface between different strata; 6) The concept of scientific development must be held in project construction. The following new solutions are proposed for tunneling by TBM/shield in China: 1) Open grid shields should be applied; 2) Extruded concrete lining should be applied; 3) The method of “TBM bore + enlarging by drill and blast” should be applied; 4) Shield can be launched from ventilation shaft in congested area. Finally it is stated that: 1) Large diameter shield is not the development trend; In the case of longdistance boring (longer than 2 km), deep shield tunneling is the development trend; 2) Shield tunneling method should be adopted for Qiongzhou strait crossing tunnel (the deep shield tunneling proposal is better than the shallow shield tunneling proposal); 3) The proposal of “10 mm TBM+drill and blast” method should be adopted for Bohai strait crossing tunnel; 4) Deep tunneling proposal consisting of “TBM bore + enlarging by drill and blast” should be adopted for Taiwan strait crossing tunnel.
Key words: TBM/shield, underwater shieldbored tunnel, shieldbored urban Metro tunnel, mountaincrossing tunnel, shield TBM, EPB shield, open shield, extruded concrete lining, shield launching from ventilation shaft, “pilot bore + enlarging by drill and blast”
WANG Mengshu. Tunneling by TBM/shield in China: Stateofart, Problems and Proposals[J]. Tunnel Construction, 2014, 34(3): 179-187.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/ 10.3973/j.issn.1672-741X.2014.03.001
http://www.suidaojs.com/EN/Y2014/V34/I3/179
Analysis for Influence Factors and Control of Shield Advance Speed Based on Field Measurement Data
Study and Practice on Negative Ring Launching Technique for DoubleShield TBM Used in Qingdao Metro
Discussion on Construction Technology for Mode Conversion between Earth Pressure Balance and SingleShield TBM of DoubleMode Shield
Separate Launching Technology of EPB Shield in Narrow Space: a Case Study on Shield Tunnel of Singapore Metro C715 Project