ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2014, Vol. 34 ›› Issue (3): 198-204.DOI: 10.3973/j.issn.1672-741X.2014.03.003
Previous Articles Next Articles
LIU Yunzhen
Received:
Revised:
Online:
Published:
Abstract:
The accuracy of most advance geology prediction systems available in tunnel construction is not high. In the paper, the problems of TSP203 advance geology prediction system are analyzed in terms of the following aspects: 1) The trigger mode of the data collection system has time delay deviation; 2) There exists acoustic interference; 3) The coupling mode of the detector causes the distortion of the seismic wave signals collected; 4) The data treatment method is too simple. Regarding the problems of TSP203, TGP has made optimizations. TGP emphasizes that comprehensive analysis should be made on basis of the engineering geology knowledge and that other proper geology prediction methods should be adopted to assist TGP. The application of the optimized TGP in tunnel construction demonstrates that the advance geology prediction accuracy has been well improved.
Key words: tunnel, advance geology prediction, accuracy, TSP203, TSP206, trigger mode, acoustic wave interference, coupling mode, extradeep shot hole
LIU Yunzhen. Comparison and Contrast between TGP206 and TSP203 Advance Geology Prediction System: Advantages of TGP206[J]. Tunnel Construction, 2014, 34(3): 198-204.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2014.03.003
http://www.suidaojs.com/EN/Y2014/V34/I3/198
Key Technologies of Cutterhead Configuration and Cutter Replacement for Large diameter Shield under High Water Pressure
Experimental Effect Prediction of Ground Conditioning of Water rich Sandy Stratum Based on BP Neural Network
Fullscale Experimental Study on Bending Performance of Segmental Joints of Large Crosssection Shield Tunnel under Pure Compressive Bending Condition
Study on Optimization of Emergency Rescue Station of Yuntunbao Tunnel on ChengduLanzhou Railway
Launching and Receiving Technology of Large Crosssection Horseshoeshaped Shield Used in Baicheng Tunnel
Design and Analysis of a New TBM Propulsion System with Small Turning Radius
Study on Key Technologies and Application of Engineering Big Data Management Platform of Tunnel Boring Machine
Improvement Technology of Bearing Capacity of Prestressed Anchor Cable in Large span Tunnel: a Case Study on Badaling Great Wall Station