| [1] |
WANG Shuangwang, YANG Bin, ZHONG Qingfeng, CHEN Liangwu.
Intelligent Fault Diagnosis of Low-Speed, Heavy-Load, Ultra-Large Rolling Bearings Using a Channel Attention Mechanism and a One-Dimensional Convolutional Neural Network
[J]. Tunnel Construction, 2026, 46(5): 985-993.
|
| [2] |
LI Wenqing, LIU Yongsheng, HONG Kairong, KOU Lei, TAN Zhongsheng, XU Weiqing, MA Shiju, ZHU Yongchao, YU Jingbo.
Mapping Relationships Between TBM Tunneling Parameters and Surrounding Rock Grades
[J]. Tunnel Construction, 2026, 46(2): 336-347.
|
| [3] |
ZHAO Xiwang, XIA Wenjie, WANG Jihong, JIANG Shuang, WANG Shugang, WU Yuanjin, LUO Zhanfu, LIU Qijun.
Rapid Prediction of Pollutant Concentration in
Construction Tunnels
Based on Proper Orthogonal Decomposition
[J]. Tunnel Construction, 2025, 45(S1): 32-41.
|
| [4] |
ZHU Yeting, ZHAO Jian, BI Xiangli, ZHU Yanfei, YU Ning, WANG Xiuzhi, HUANG Dezhong, QIN Yuan.
Engineering Verification of Parallel Control Technology for Automatic Shield Tunneling and Segment Assembly
[J]. Tunnel Construction, 2025, 45(8): 1602-1614.
|
| [5] |
ZHU Yeting, BI Xiangli, ZHU Yanfei, YU Ning, WU Di, QIN Yuan, WANG Zhihua, JIANG Haibo.
Retrofit and Engineering Practice of Automatic Tunneling Attitude Control for Existing Metro Shield Machines
[J]. Tunnel Construction, 2025, 45(7): 1378-1386.
|
| [6] |
RONG Miren, FENG Chao, PANG Yinping, LUO Lanxin, YUAN Ying, GENG Dongyang, ZHENG Yongrui, LI Jiayin.
Metro Settlement Prediction Based on Wavelet Threshold Denoising-Phase Space Reconstruction Data Processing and Grid Search Method-Optimized Support Vector Machine Regression Model
[J]. Tunnel Construction, 2025, 45(11): 2033-2043.
|
| [7] |
WANG Haitao, ZHOU Chun, SUN Jiuchun, WANG Yue.
Stratum Identification in
Shield Tunneling Based on Vibration Signals
[J]. Tunnel Construction, 2024, 44(11): 2202-2212.
|
| [8] |
LIU Xingen, WANG Bozhi, LIU Xiaodi.
Track Deviation Correction Method of Shield Based on
Space S-Curves
[J]. Tunnel Construction, 2023, 43(S1): 457-463.
|
| [9] |
LI Gongyi.
Fault Analysis and Countermeasures for Screw Conveyor
of Earth Pressure Balance Shield Boring in LongDistance Hard Rock Section
[J]. Tunnel Construction, 2022, 42(S2): 502-507.
|
| [10] |
LIU Jiajun, YANG Guang, WANG Junjie, HAN Weifeng, CAI Jun, ZHAO Xiangbo.
Development and Application of Intelligent Grease
Monitoring Device for Shield Based on Phase Laser Sensor
[J]. Tunnel Construction, 2022, 42(S2): 525-532.
|
| [11] |
CHEN Qiankun.
EnlargingDiameter Modification of
Composite Cutterhead of Shield Based on ANSYS
[J]. Tunnel Construction, 2022, 42(S2): 533-540.
|
| [12] |
TIAN Xuehao, KANG Jia′an, JIANG Shuai, YU Peng, FU Kaiyong.
Research on Geological Prediction System of Rock
Drilling Jumbo Based on
Least Squares Support Vector Machine
[J]. Tunnel Construction, 2022, 42(S1): 267-273.
|
| [13] |
ZHU Yeting.
Model Test Verification of Synchronous Technology
Combining Shield Tunneling with Segment Assembling Based on Principle
of Uniform Loading on a Single Segment
[J]. Tunnel Construction, 2022, 42(5): 854-862.
|
| [14] |
LI Hongbo.
Prediction and Identification Method of Tunnel Boring
Machine Surrounding Rock Grade Based on Tunneling Parameters Inversion
[J]. Tunnel Construction, 2022, 42(1): 75-82.
|
| [15] |
WU Huiming, CHANG Jiaqi, LI Gang, ZHANG Dongming, HUANG Hongwei.
Prediction of Driving Posture and Optimization of Construction
Parameters for
Shield Based on Support Vector Machine
[J]. Tunnel Construction, 2021, 41(S1): 11-.
|