[1] |
ZHANG Tongsong.
Study on Scheme of Tshaped
Metro Transfer Station with Part Route
[J]. Tunnel Construction, 2020, 40(7): 1011-1016.
|
[2] |
JIANG Lijie, WEN Yongliang, JIA Lianhui, CHEN Baozong, HE Fei.
Design and Analysis of a New TBM Propulsion System
with Small Turning Radius
[J]. Tunnel Construction, 2020, 40(7): 1081-1087.
|
[3] |
HUANG Jieqing, LI Ying, LIU Xingwang.
Two-stage Conjoint Analysis Method for Tunnel Structures under Unloading
[J]. Tunnel Construction, 2020, 40(5): 672-678.
|
[4] |
LYU Qianqian, SUN Zhenchuan, ZHOU Jianjun, YANG Zhenxing, CHEN Ruixiang.
Experimental Study on Mechanical Behavior and Sealing Performance of Low Vacuum Tunnel Structure
[J]. Tunnel Construction, 2020, 40(4): 496-503.
|
[5] |
SUI Hongrui, ZHOU Jinzhong, HE Weiguo.
Upgrading and Improvement of Insulation Measures for FoamWater Spray System of Haihe Tunnel in Tianjin
[J]. Tunnel Construction, 2020, 40(2): 283-291.
|
[6] |
HE Zhiyong, ZHONG Hongwu, CHEN Zhenhua.
Safety Evaluation and Finite Element Analysis of Tunnel Lining with Cracks
[J]. Tunnel Construction, 2019, 39(S2): 69-77.
|
[7] |
GUO Lu, LI Jing, WANG Dongyuan, HAN Ying.
Simulations for Effect of Confined Water Exploitation on Subway Station-tunnel System in Binhai Area of Tianjin
[J]. Tunnel Construction, 2019, 39(S2): 141-146.
|
[8] |
ZHANG Junru, YAN Congwen, YE Lun, WANG Anhui, ZHAO Zijing, FENG Jimeng.
Analysis of Mechanical Effect of Box Culvert Jacking on Bottom Pipe Curtain
[J]. Tunnel Construction, 2019, 39(S1): 73-79.
|
[9] |
DING Xiaojun, LIU Yao, LEI Mingfeng.
Calculation of Bending Moment Bearing Capacity of Circular Reinforced Concrete Pile after Partial Excision and Its Application
[J]. Tunnel Construction, 2019, 39(S1): 88-93.
|
[10] |
XIONG Haoxiang, XU Qingshuang, REN Hui.
Investigation on Jacking Force Parameters of Curved Piperoofing Construction in Gongbei Tunnel
[J]. Tunnel Construction, 2019, 39(S1): 146-151.
|
[11] |
LUO Yanping, HAN Jingke, WEN Zhan, LUO Yang, LIU Pu.
Optimization of Ventilation Scheme of Jinjiazhuang Extralong Spiral Tunnel
[J]. Tunnel Construction, 2019, 39(S1): 385-391.
|
[12] |
LIANG Xiaoliang, SHI Qingneng, DENG Lin, TANG Yong, LIU Shouhua, YANG Junsheng.
Comparison and Selection of Construction Schemes for Interchange Node under Existing Operating Metro Stations
[J]. Tunnel Construction, 2019, 39(S1): 369-376.
|
[13] |
WANG Ning, GAO Yi, YU Shaohui, LI Yang.
Disturbance of Rectangular Pipe Jacking Tunnel Group Construction on Soil Behind Working Shaft
[J]. Tunnel Construction, 2019, 39(3): 413-420.
|
[14] |
CHENG Peng, GAO Yi, YU Shaohui, LI Yang.
Safety Analysis of Structure System of Structural Cut and Convert Method
[J]. Tunnel Construction, 2019, 39(3): 435-443.
|
[15] |
WANG Kai, SUN Zhenchuan, NIU Zilong, WANG Guoan, LI Fengyuan, ZHANG Bing.
Analysis and Calculation on Thrust Force and Torque of Extra-large Diameter Slurry Shield in Soft Soil
[J]. Tunnel Construction, 2019, 39(12): 2074-.
|