Tunnel Construction ›› 2014, Vol. 34 ›› Issue (5): 499-502.DOI: 10.3973/j.issn.1672-741X.2014.05.017
Previous Articles
WEI Chenliang, WANG Yuqing, TANG Gaohong
Received:
Revised:
Online:
Published:
Abstract:
During the consolidation of the waterrich cobble ground in Nanning by means of Soletanche grouting, it is difficult to control the spreading of the grout and it is difficult to guarantee the consolidation effect. In order to solve these problems, the grouting parameters and the mixing ratio of the grout are optimized on basis of the indoor test results and the field test results, composite grout that has high antidiffusion capacity is obtained by adding additives, and slow grouting is executed under low pressure. In the end, the reliability of the grouting for the waterrich cobble ground is improved.
Key words: Nanning rail transit project, waterrich cobble ground, Soletanche grouting, composite grout, grouting slowly under low pressure
WEI Chenliang, WANG Yuqing, TANG Gaohong. Case Study on Consolidation of Waterrich Cobble Ground in Nanning by means of Soletanche Grouting[J]. Tunnel Construction, 2014, 34(5): 499-502.