ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2015, Vol. 35 ›› Issue (1): 46-52.DOI: 10.3973/j.issn.1672-741X.2015.01.008

Previous Articles     Next Articles

Design and Construction of SMART in Kuala Lumpur

XIAO Xiaochun   

  1. (Shanghai Tunnel Engineering Co., Ltd., Shanghai 200032, China)
  • Received:2014-07-09 Revised:2014-12-02 Online:2015-01-19 Published:2015-02-09

Abstract:

A tunnel proposal named SMART is put forward to solve the problem of flood discharge in raining seasons and to mitigate the traffic congestions in downtown area of Kuala Lumpur. The tunnel, with 9.7 km length, has an internal diameter of 11.8 m. In nonflood seasons, the 3 kmlong central section of the tunnel is also used as motorway tunnel with 4 lanes in bidirections. In the paper, the critical issues involved in the course of proposal conceive, project design and construction are briefly presented, which can provide reference for similar projects in the future.

Key words: SMART, superlarge crosssection, shield tunnel, multifunction, flood discharge, motorway tunnel

CLC Number: