ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2015, Vol. 35 ›› Issue (1): 83-88.DOI: 10.3973/j.issn.1672-741X.2015.01.014

Previous Articles     Next Articles

Early Deformation Analysis and Excavation Optimization of Junction Sections of Large Crosssection Loess Tunnels

WANG Yue, SHI Jiyao   

  1. (Technology Center of China Railway Tunnel Group Co., Ltd., Luoyang 471009, Henan, China)
  • Received:2014-08-19 Revised:2014-11-20 Online:2015-01-19 Published:2015-02-09

Abstract:

The regularity of the deformation of the junction sections of tunnels in No. 14 bid section of BaojiLanzhou passenger dedicated line is studied on basis of the monitoring results, so as to improve the construction safety of critical positions of large crosssection loess tunnels. It is concluded that the intermediate bench excavation and the invert casting are critical points in terms of deformation development and deformation control. Furthermore, the maximum deformation of the junction section of No. 3 inclined shaft of Guchengling tunnel is predicted on basis of the study results, and the excavation method is optimized accordingly. In the end, the deformation of the mentioned junction section has been well controlled. 

Key words: large crosssection loess tunnel, BaojiLanzhou passenger dedicated line, monitoring, junction section, early deformation, excavation optimization

CLC Number: