| [1] |
GUO Yanhui, BI Wei.
Carbon Emission Analysis of Fully Electrified Integrated Equipment Systems in Highway Tunnel Construction: A Case Study of Qiaojia Tunnel in Yunnan, China
[J]. Tunnel Construction, 2026, 46(S1): 164-175.
|
| [2] |
JIANG Hua, WANG Zixiao, GUO Yongjian, GAN Congyu, LIU Hongzhi, SUN Shuliang.
Intelligent Monitoring of Rock Slag Volume in Slurry Shield Screening Based on Binocular-Vision Point Cloud
[J]. Tunnel Construction, 2026, 46(S1): 196-204.
|
| [3] |
ZHOU Chuanchuan, XIA Wenjie, WANG Jihong, JIANG Shuang, WANG Shugang, WU Yuanjin, LUO Zhanfu, LIU Qijun.
Optimal Deployment of CO Monitoring Sensors for Blasting Operations in Drill-and-Blast Tunnels
[J]. Tunnel Construction, 2026, 46(S1): 519-528.
|
| [4] |
YUAN Zhenzhong, FANG Zhongqiang, YUE Ben, YU Zihan, WANG Wei, XU Zhisheng.
Smoke-Spread Distance of a Unilateral Centralized Exhaust With Symmetric Openings of Smoke-Exhaust Valves in Inclined Tunnels
[J]. Tunnel Construction, 2026, 46(9): 1874-1884.
|
| [5] |
YAN Xiao, ZHANG Yazhou, YAO Zhanhu, ZHANG Dongmei, ZHANG Lei, XU Mingyuan, ZHOU Wending, LIANG Yuqiang, LU Mingfei, LI Hui.
Comparison and Selection of Structural Schemes for Underground Shield Docking in High-Water-Pressure Saturated Sandy Stratum and Its Engineering Application
[J]. Tunnel Construction, 2026, 46(6): 1330-1341.
|
| [6] |
FENG Shouzhong, KAN Deyuan, XIE Chengdong, YAN Zhiguo, SONG Yuan.
Coupling Analysis of Multiple Influencing Factors of Dynamic Visual Distance Based on Tunnel Luminous Environment
[J]. Tunnel Construction, 2026, 46(5): 935-945.
|
| [7] |
HU Qiang, LIU Wenxing, ZHANG Anrui, WU Mingfang, GUO Chun.
Low-Carbon Design Method for Highway Tunnel Lining Maintenance and Reinforcement Based on Life Cycle Assessment and Genetic Algorithm Optimization
[J]. Tunnel Construction, 2026, 46(4): 804-816.
|
| [8] |
HOU Ye, YANG Chaoshuai, DING Yuxiang, HU Jie, LI Hongru, LI Xiaofeng, CAO Shuangli, HE Manchao.
Three-Dimensional Negative Poisson′s Ratio Active Support Systems for Rockburst Prevention and Control in Deep Tunnels
[J]. Tunnel Construction, 2026, 46(4): 852-868.
|
| [9] |
WANG Yanning, LI Taikai, MIN Xinhao.
State of the Art of Machine Learning in Tunnel Engineering
[J]. Tunnel Construction, 2026, 46(2): 233-245.
|
| [10] |
ZHOU Zhong, LI Shishuai, LU Wanghao.
A Method for Data Augmentation and Intelligent Recognition of Crack Defects in Highway Tunnel Linings by Integrating Deep Convolutional Generative Adversarial Networks and Dual-Task YOLO Model
[J]. Tunnel Construction, 2025, 45(S2): 380-389.
|
| [11] |
ZHANG Kaiwen, HE Yongjun, ZHANG Yun, WANG Jin, SHUAI Chunyan.
Application of Real-Time Regulation Energy-Efficient System for Highway Tunnel
Lighting
[J]. Tunnel Construction, 2025, 45(S1): 71-79.
|
| [12] |
CAO Xiaoyong, ZHANG Menghan, XI Weizheng, XU Ping, YE Fei, HAN Xingbo.
Corrugated Steel Support Design for Highway Tunnel
Shafts: A Case Study of Yinggeling Tunnel
[J]. Tunnel Construction, 2025, 45(S1): 182-192.
|
| [13] |
WANG Jian, CHEN Weitao, HUANG Peng, ZHANG Lixiang, YU Li, WANG Xue, LIU Yuan, LI Junqi, WANG Song.
Geometric Parameters of Spiral Highway Tunnels With
Large Slopes and Small Radius
[J]. Tunnel Construction, 2025, 45(S1): 193-207.
|
| [14] |
HUANG Shuhua.
Key Construction Technology and Application Practice
of Mechanized Connecting Passage of a Super-Large Diameter Shield Tunnel in Complex Water-Rich Strata
[J]. Tunnel Construction, 2025, 45(S1): 280-289.
|
| [15] |
CAI Caiwu.
Mechanical Effects of Vertical Shaft Construction in Intercity Railways Using Vertical Machinery Method
[J]. Tunnel Construction, 2025, 45(9): 1640-1648.
|