Abstract:
The excavation and secondary lining of flatroof straightwall tunnels with shallow overburden have great risks. In the paper, the applicability of the flatroof straightwall tunnels is analyzed. Three methods for the installation of the secondary lining of flatroof straightwall tunnels are compared in terms of span, excavation method, risk and construction period, with a mined flatroof straightwall underpass of a Metro works as an example. The advantages, disadvantages and application conditions of the mentioned three methods are summarized. The installation method and steps for the secondary lining of mined flatroof straightwall structures under the condition that the support is not removed are proposed. The key points of the design of mined flatroof straightwall tunnels are summarized and the principle for the node treatment is proposed.
Key words: underground structure, mining under shallow cover, flat roof, straight wall, secondary lining
CLC Number:
U 455
TIAN Haibo. Technology for Secondary Lining of Largespan Flatroof Straightwall Tunnels[J]. Tunnel Construction, 2015, 35(3): 268-273.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2015.03.013
http://www.suidaojs.com/EN/Y2015/V35/I3/268