Abstract:
In planning projects crossing rivers, lakes or sea, we have to consider which of the following schemes, i.e., the bridge scheme, the tunnel scheme or the “bridge+tunnel” scheme, should be adopted. In the paper, first, the Huangpu river crossing projects built in Shanghai in recent years are presented; then, bridges or tunnels crossing rivers that have been built in China and abroad are presented. It is concluded that the following three factors, i.e., the requirements (including the traffic demand, the urban and/or regional planning and development requirements, etc.), the feasibility (including the navigation channel, the hydrology, the meteorology, the technology, the economy, etc.), the safety (including the seismic resistance, the wind resistance, the disaster prevention, the national defense, the sustainable development, the durability, the environment, etc.), should be considered in the comparison of river crossing project schemes. Chongming rivercrossing project built in Shanghai, which consists of tunnel in the south section and bridge in the north section, is a successful project. Finally, the method for the bridge/tunnel scheme comparison is discussed. It is recommended that numerical models suitable for the actual conditions should be established, quantitative and qualitative combined analysis should be made and feasible comparison method should be taken so as to achieve a rational final scheme.
Key words: river (sea) crossing project, bridge, tunnel, comparison
CLC Number:
U 455
SUN Gengyao. Rivercrossing or Seacrossing Project: Bridge, Tunnel, or Bridgetunnel Combination[J]. Tunnel Construction, 2015, 35(7): 611-615.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2015.07.001
http://www.suidaojs.com/EN/Y2015/V35/I7/611
Key Technologies of Cutterhead Configuration and Cutter Replacement for Large diameter Shield under High Water Pressure
Experimental Effect Prediction of Ground Conditioning of Water rich Sandy Stratum Based on BP Neural Network
Fullscale Experimental Study on Bending Performance of Segmental Joints of Large Crosssection Shield Tunnel under Pure Compressive Bending Condition
Study on Optimization of Emergency Rescue Station of Yuntunbao Tunnel on ChengduLanzhou Railway
Launching and Receiving Technology of Large Crosssection Horseshoeshaped Shield Used in Baicheng Tunnel
Design and Analysis of a New TBM Propulsion System with Small Turning Radius
Study on Key Technologies and Application of Engineering Big Data Management Platform of Tunnel Boring Machine
Improvement Technology of Bearing Capacity of Prestressed Anchor Cable in Large span Tunnel: a Case Study on Badaling Great Wall Station