Tunnel Construction ›› 2015, Vol. 35 ›› Issue (7): 679-685.DOI: 10.3973/j.issn.1672-741X.2015.07.011

Previous Articles     Next Articles

Field Experimental Study on Mechanics of Segment Structure of  Slender West Lake Shieldbored Tunnel in Yangzhou

LIANG Xiao1, LIU Xian1, CHEN Jian2, KONG Yuqing2   

  1. (1. Department of Geotechnical Engineering, Tongji University, Shanghai 200092, China; 2. China Railway 14th Construction Bureau Co. Ltd, Jinan 250000, Shandong,China)
  • Received:2015-02-09 Revised:2015-04-03 Online:2015-07-20 Published:2015-07-29

Abstract:

Field tracking tests are carried out to measure the load and internal force of the segment lining structure of shieldbored tunnels during and after the tunnel construction, with the Slender West Lake Shieldbored Tunnel as the engineering background, so as to discuss the influences of simultaneous grouting on the mechanic characteristics of segment lining structure. The study shows that: 1) the variation of the load and internal forces of the segment lining structure can be obtained comprehensively and accurately by the field experiment method described in this paper; 2) in general, the load on the lining structure reduces as the time goes on before it gradually becomes stable; 3) because of the grouting effect, the load on the lining structure during the construction stage is larger than that in the stable state; 4) the internal force of the lining structure is not stable in the grouting stage, and the grouting has great effect on the axial force of the lining structure. 

Key words: shieldbored tunnel, segment lining, field experiment, construction condition, internal force

CLC Number: