[1] |
FU Xiaoqiang, LIU Jifeng, ZHANG Huizhi, ZHANG Shiping, LEI Zhen.
Principal Component Feature Extraction and Millisecond Delay Recognition of Tunnel Blasting Signal
[J]. Tunnel Construction, 2019, 39(S1): 117-124.
|
[2] |
WEI Xiao, GAO Wenxue, WANG Lintai, CAO Xiaoli.
Analysis and Application of Metro Tunnel Blasting Vibration Signal Based on EEMD
[J]. Tunnel Construction, 2019, 39(8): 1293-1300.
|
[3] |
HUANG Tao, LIU Quansheng, HUANG Xing, ZHANG Xiaoping, LU Xinjing.
Research and Development of RealTime Monitoring System forScraper Wear and Laboratory Verification Experimental Test
[J]. Tunnel Construction, 2018, 38(S2): 364-373.
|
[4] |
LI Dongli, SUN Wei, ZHONG Qingfeng, MENG Xiangbo, GAO Ming, FENG Shuo.
Research on Visualized Realtime Monitoring System for Soil Chamber of Composite Shield
[J]. Tunnel Construction, 2018, 38(9): 1585-1590.
|
[5] |
ZHUO Xingjian, LU Yati.
Realtime Wear Monitoring System for Scrape Cutters and Tearing Cutters
[J]. Tunnel Construction, 2018, 38(6): 1060-1065.
|
[6] |
LI Zhitang, YIN Rongshen, MENG Yafeng, DENG Weihua, CHEN Lanjiang.
Analysis of Vibration Response and Cavity Effect of Blasting Construction of Tunnel in SoilRock Interlaced Strata
[J]. Tunnel Construction, 2018, 38(4): 588-593.
|
[7] |
WANG Jun, QIU Jingge, YANG Fan, WANG Qingpeng, TAN Tianle.
Study of Disturbance Effect of Tunneling Blasting on Dangerous Rock of a Giant Dry Karst Cave Wall
[J]. Tunnel Construction, 2018, 38(1): 41-49.
|
[8] |
HE Chuang, YIN Dongmei, WANG Hailiang, YAN Honghao.
Analysis of Influence of Free Surface and Minimum Resistance Line on Blasting Vibration
[J]. Tunnel Construction, 2018, 38(1): 50-56.
|
[9] |
PENG Yufeng, TIAN Liang, YANG Dongsheng, KANG Xianghui,HUANG Ze, SUN Yunhua, TAN Jun.
Gas Drainage Technology for Mediumthickness Coal Seam in Yujingshan Tunnel
[J]. Tunnel Construction, 2017, 37(12): 1600-1606.
|
[10] |
HE Chuang, WANG Hailiang.
Study of Micro Vibration Blasting Parameters of Multilevel Wedgecutting of Mined Metro Station
[J]. Tunnel Construction, 2016, 36(8): 941-946.
|
[11] |
JIANG Li, HUANG Huadong, WANG Xianyi, CHEN Huashen.
Application of Tunnel Blasting Vibration Disaster Prediction Based on LMBP Neural Network
[J]. Tunnel Construction, 2016, 36(5): 525-530.
|
[12] |
WANG Yapeng, WANG Hailiang, HE Chuang, WEI Dongdong, LI Ziyuan.
Analysis of Influence of Spacing of Blast Holes with Same Detonation Delay on Maximum Blasting Vibration Velocity
[J]. Tunnel Construction, 2016, 36(10): 1232-1236.
|
[13] |
HE Chuang, WANG Hailiang.
Optimization Analysis on Blasting Parameters forBlasting Control of Metro Station Tunnels
[J]. Tunnel Construction, 2016, 36(1): 97-101.
|
[14] |
LI Kexian, ZHAO Jizeng, LEI Gang.
Study on Vibrationreducing Effect of Deep and Large Vibrationreducing Hole: Case Study on Control Blasting of a Shallowburied Mined Station of Qingdao Metro
[J]. Tunnel Construction, 2015, 35(6): 595-600.
|
[15] |
GAO Qiang, YU Wenlong.
Analysis on Influence of Excavation of Foundation Pit of Municipal Tunnel on Existing Underlying Shieldbored Metro Tunnel
[J]. Tunnel Construction, 2014, 34(4): 311-317.
|