| [1] |
YANG Hao, WANG Leming, LIU Zhuangzhuang, WANG Pengle, LI Jiaqi.
Mechanical Mechanism of Composite Double-Layer Lining Shield TunnelStructures Under Riverbed Scouring: A Case Study of Chongtai Yangtze River Tunnel
[J]. Tunnel Construction, 2026, 46(5): 1060-1072.
|
| [2] |
FAN Chuangang, HA Jiayi, FEI Xiaoxian, LIU Maozhen, ZHU Qinqin, YU Longxing.
Smoke Stratification Characteristics of Tunnel Fires Under Construction in High-Geothermal Environment
[J]. Tunnel Construction, 2026, 46(4): 682-693.
|
| [3] |
AN Zheli, YUAN Zhenyu, MA Weibin, WANG Yong, HAN Zili.
An Intelligent Decision-Making Method Based on a Domain Knowledge Graph for Proactive Prevention and Control of Geohazards in Tunnels
[J]. Tunnel Construction, 2026, 46(4): 719-732.
|
| [4] |
ZHAO Xiaoyong, LI Guoliang, WANG Xindong, GAO Xinqiang, XIONG Wei, GUO Xiansuo.
Mechanical Properties of Prefabricated Inverted Arch Structures in Railway Tunnels During Construction
[J]. Tunnel Construction, 2026, 46(4): 828-839.
|
| [5] |
WANG Yanning, LI Taikai, MIN Xinhao.
State of the Art of Machine Learning in Tunnel Engineering
[J]. Tunnel Construction, 2026, 46(2): 233-245.
|
| [6] |
ZHANG Junru, CHEN Pengtao, WANG Lichuan, WANG Wen, HE Weiguo, JIANG Xinqiang, HUANG Linxiang, PAN Tong.
A Support Parameter Optimization Method for Arch-Cover Method of Mined Metro Stations Based on Displacement Prediction
[J]. Tunnel Construction, 2026, 46(2): 260-272.
|
| [7] |
ZHAO Jingwei, LI Haoqi, SUN Yu.
Evaluation of Spatial Integration in Metro Station Areas From Perspective of Urban Renewal: A Case Study of Shinan District, Qingdao, China
[J]. Tunnel Construction, 2026, 46(1): 46-59.
|
| [8] |
LEI Mingfeng, LI Changwan, YANG Pengliang, JIA Chaojun, LI Chuitian.
Impact Zoning of Construction Disturbance on Nearby Existing Damaged BuildingsInduced by Foundation Pit of a Metro Station Based on Extended Finite Element Method and Response Surface Method
[J]. Tunnel Construction, 2026, 46(1): 69-79.
|
| [9] |
BAI Qian, LI Zheng, ZHAO Wen, PENG Zhipeng.
Impact of Small Pipe-Roof-Top Slab Method Support Parameters in Metro Stations on Surface Settlement
[J]. Tunnel Construction, 2026, 46(1): 103-112.
|
| [10] |
LI Yitao.
Influence of Foundation Coefficient on Anti-Pull Mechanical Construction of Cross Passages
[J]. Tunnel Construction, 2026, 46(1): 157-167.
|
| [11] |
FENG Jimeng, LI Yifei, YAO Shiyu, WANG Shengtao, ZHANG Junru, SUN Ning.
Interactive Influence and Deformation Control of Construction Timing in Pile-Beam-Arch Method Metro Stations With Tunnel-Before-Station Sequence
[J]. Tunnel Construction, 2026, 46(1): 183-193.
|
| [12] |
ZHU Yanfei, JI Maojie, YU Ning, GUO Yan, PAN Weiqiang, ZHU Ling.
Research and Application of Active Control Press-in Prefabricated Shaft Construction Method in Urban Core Area With Soft Soils
[J]. Tunnel Construction, 2025, 45(S2): 1-10.
|
| [13] |
ZHANG Dongmei, GAN Binlin, SHEN Yiyao, HUANG Zhongkai, ZHANG Guiyang, ZHANG Wei.
A Systematic Review of Disturbance Effects and Control for Existing Shield Tunnels Induced by Adjacent Construction
[J]. Tunnel Construction, 2025, 45(S2): 11-29.
|
| [14] |
ZHANG Zhiguo, WAN Qimeng, LI Junjie, NI Yin, JIA Haoran, WEI Jian.
Impact of Deep Foundation Pit Excavation on Existing Metro Stations in Rheological Soft Strata and Reinforcement Effects: A Case Study of Shanghai Jinqiao Metro Over-Track Project
[J]. Tunnel Construction, 2025, 45(S2): 97-106.
|
| [15] |
FANG Qian, YOU Qizhao, WANG Jianchen, WANG Gan, KE Chengjian, RU Zhenhua.
Deformation of Existing Metro Structures Induced by Newly Built Metro Undercrossing: A Case Study of 18 Newly Built Metro Projects in Beijing
[J]. Tunnel Construction, 2025, 45(S2): 125-139.
|