ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2015, Vol. 35 ›› Issue (S2): 181-186.DOI: 10.3973/j.issn.1672-741X.2015.S2.033
Previous Articles Next Articles
XIE Dawen, LIU Yi, WANG Hua
Received:
Revised:
Online:
Published:
Abstract:
The mechanization matching program has been successfully used in construction of AngrenPap Singleline Railway Tunnel in Uzbekistan, and good effects have been achieved. The paper can provide reference for mechanization matching of similar projects in the future.
Key words: singleline railway tunnel, mechanization matching
CLC Number:
U 45
XIE Dawen, LIU Yi, WANG Hua. Application of Mechanization Matching Program in AngrenPap Singleline Railway Tunnel in Uzbekistan[J]. Tunnel Construction, 2015, 35(S2): 181-186.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2015.S2.033
http://www.suidaojs.com/EN/Y2015/V35/IS2/181