Tunnel Construction ›› 2015, Vol. 35 ›› Issue (S2): 63-67.DOI: 10.3973/j.issn.1672-741X.2015.S2.012

Previous Articles     Next Articles

Construction Technologies for Serious Rock Burst Section of AngrenPop Railway Tunnel

LI Hongjun1, GUO Zhiwu1, LIU Hongzhen2, ZHAO Hailong3   

  1. (1. China Railway Tunnel Group Co., Ltd., Luoyang 471009, Henan, China; 2. Technical Center of China Railway Tunnel Group Co., Ltd., Luoyang 471009, Henan, China; 3. The First Construction Division Co., Ltd. of China Railway Tunnel Group, Chongqing 401123, China)
  • Received:2015-05-29 Revised:2015-05-29 Online:2015-12-15 Published:2015-12-24

Abstract:

In this paper, the geological conditions and rockbust course of serious rock burst section of AngrenPop railway tunnel in Uzbekistan are described in detail. The causes of rock bust are analyzed in terms of rockburst conditions and geological conditions. The countermeasures for rock bust are presented. In the end, the safety of the construction of serious rock burst section has been guaranteed.

Key words: railway tunnel, serious rock burst, reinforcement, bench method, monitoring