Study of Deformation Characteristics of Large Crosssection Tunnel in Xigeda Fm Strata

WANG Zhijie1, XU Ruining1, 2, *, HE Nengfang3   

  1. (1. Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Chengdu 610031, Sichuan, China; 2. Hebei Provincial Communications Planning and Design Institute, Shijiazhuang 050011, Hebei, China; 3. CCCC Tunnel Fourth Engineering Company Limited, Chengdu 610041, Sichuan, China)
  • Received:2016-04-18 Revised:2016-08-22 Online:2016-12-20 Published:2016-12-30

Abstract:

The deformation characteristics of large crosssection Tongzilin Tunnel on MiyiPanzhihua Section on ChengduKunming Railway located in Xigeda Fm strata and constructed by three bench+temporary invert arch method are studied by numerical simulation and site monitoring, so as to guarantee the stability of surrounding rocks during construction. The study results show that: 1) The deformations of surrounding rocks of large crosssection tunnel in Xigeda Fm strata are mainly along vertical direction. 2) The primary crown top settlement and crown top settlement induced by top heading excavation takes 41.3% in total settlement; and the advanced influencing range is 1.3D. 3) The crown top settlement and arch feet convergence are mainly affected by middle bench excavation. 4) The prediction formula for crown top settlement vs. time is U=102.105·exp(-5.33/X). 5) The prediction formula for horizontal convergence of arch feet vs. time is L1=19.552·exp(-7.49/X). 6) The prediction formula for horizontal convergence of tunnel wall waist vs. time is L2=17.862·exp(-23.26/X).

Key words: Xigeda Fm strata, large crosssection tunnel, deformation characteristic, numerical simulation, field experiment