| [1] |
JIANG Qiao, WANG Shuangjing, JING Liujie, SHI Yunlong, WEI Xiaolong, LI Pengyu, YANG Chen.
Disc Cutter Wear of Tunnel Boring Machine in Hard Rocks of Pumped Storage Hydropower Station
[J]. Tunnel Construction, 2024, 44(S2): 470-477.
|
| [2] |
TAN Zhongsheng, DENG Mingjiang.
Resea-Long
Tunnels
[J]. Tunnel Construction, 2024, 44(3): 442-463.
|
| [3] |
HE Jingjian.
Reasonable Application, Damage Causes Analysis, and
Optimization Techniques of Tunnel
Boring Machine Disc Cutters in Bid 2 Project of Lanzhou Water Source
[J]. Tunnel Construction, 2022, 42(S1): 500-507.
|
| [4] |
YU Fangzheng, QIAO Haoli, ZHU Ronghui, SUN Jianping, CUI Ming, LIU Hongzhi.
Wear Law of Shield Disc Cutter of Shield Tunneling in
Hard-Soft Mixed Strata of
Water Conveyance Tunnel of Tuancheng Lake No.9 Water Plant in Beijing
[J]. Tunnel Construction, 2022, 42(S1): 536-543.
|
| [5] |
DU Chuangdong, HONG Kairong, LI Zhijun, YANG Yandong.
Key Technologies of Tunnel Boring Machine Passing
through Unfavorable Geology: a
Case Study of Entrance Section of a Plateau Railway Tunnel
[J]. Tunnel Construction, 2022, 42(7): 1274-1288.
|
| [6] |
ZHOU Jianjun, ZHAI Qianzhi, MA Li, WANG Liming, LI Hongbo, ZHAO Hailei.
Effect of Angle between Mucking Slot and Adjacent Disc
Cutter on
Disc Cutter Wear Law
[J]. Tunnel Construction, 2021, 41(3): 349-355.
|
| [7] |
JIANG Lijie, WEN Yongliang, JIA Lianhui, CHEN Baozong, HE Fei.
Design and Analysis of a New TBM Propulsion System
with Small Turning Radius
[J]. Tunnel Construction, 2020, 40(7): 1081-1087.
|
| [8] |
ZHAI Qianzhi, ZHOU Jianjun, LI Hongbo, WANG Liming.
A Case Study on Double-shield TBM Disc Cutter Wear and Replacement Estimation
[J]. Tunnel Construction, 2019, 39(12): 2081-.
|
| [9] |
QIN Yinping, ZHANG Zhuqing, SUN Zhenchuan, CHEN Kui, YANG Yandong.
Analysis and Prediction of TBM Disc Cutter Wear Based on Field Test
[J]. Tunnel Construction, 2019, 39(11): 1914-.
|
| [10] |
YANG Yu.
Prediction of Disc Cutter Wear of Shield Used in Seacrossing Section on Xiamen Rail Transit Line No. 3
[J]. Tunnel Construction, 2018, 38(S1): 182-187.
|
| [11] |
CAI Yu, ZHU Heyi, YANG Xiaoyu, WEI Yuqi, XIA Ming.
Experimental Study of Disc Cutter Abrasion of TBM Used in Qinling Tunnel of Hanjiang RiverWeihe River Water Conveyance Project with High Abrasive Hard Rock
[J]. Tunnel Construction, 2018, 38(9): 1579-1584.
|
| [12] |
LI Xiangdong.
Study of Key Problems in Investment Control for Qinling Tunnel of Hanjiang RiverWeihe River Water Division Project
[J]. Tunnel Construction, 2017, 37(9): 1090-1096.
|
| [13] |
SU Ming, LI Tong, HAN Aimin, JIN Lizhong, LIU Xuezhu.
Quantitative Prediction Method for Disc Cutter Wear Based on Specific Wear Index
[J]. Tunnel Construction, 2017, 37(7): 891-898.
|
| [14] |
XU Liming, YANG Yandong, ZHOU Jianjun, CHEN Kui, CAI Guangyuan.
Prediction of Disc Cutter Wear and Replacement of Shield used inSeacrossing Section of Xiamen Rail Transit Line No. 2
[J]. Tunnel Construction, 2016, 36(11): 1379-1384.
|
| [15] |
LI Taomeng, SUN Haibo.
Nondestructive Disassembling Technologies for Largediameter Opentype TBMs
[J]. Tunnel Construction, 2015, 35(S2): 197-204.
|