Tunnel Construction ›› 2016, Vol. 36 ›› Issue (5): 544-548.DOI: 10.3973/j.issn.1672-741X.2016.05.008

Previous Articles     Next Articles

Optimization Analysis of Calculation of Temporary Ring  Beam for Shield Hoisting Shaft of Metro Station

GAO Tao1, ZHAO Rui2   

  1. (1. Yellow River Engineering Consulting Co., Ltd., Zhengzhou 450003, Henan, China;  2. Shangqiu Water Conservancy Construction Survey Design Institute, Shangqiu 476000, Henan, China)
  • Received:2015-11-09 Revised:2016-02-19 Online:2016-05-20 Published:2016-05-25

Abstract:

During the shield hoisting, the lateral pressure is mainly borne by the temporary ring beam; meanwhile, the stresses of surrounding soil are complicated. A threedimensional model of temporary ring beam is built and calculated. The calculation results are compared with conventional twodimensional model. Some conclusions are drawn as follows: 1) Twodimensional calculation has some disadvantages, such as too large bending moment and overconservative reinforcement, etc. 2) Compared with twodimensional calculation, threedimensional modeling calculation results are more rational. The study results can provide references for similar projects in the future.

Key words: Metro station, shield hoisting shaft, temporary ring beam, SAP2000, finite elements, threedimensional integral calculation, twodimensional calculation