ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2016, Vol. 36 ›› Issue (5): 544-548.DOI: 10.3973/j.issn.1672-741X.2016.05.008
Previous Articles Next Articles
GAO Tao1, ZHAO Rui2
Received:
Revised:
Online:
Published:
Abstract:
During the shield hoisting, the lateral pressure is mainly borne by the temporary ring beam; meanwhile, the stresses of surrounding soil are complicated. A threedimensional model of temporary ring beam is built and calculated. The calculation results are compared with conventional twodimensional model. Some conclusions are drawn as follows: 1) Twodimensional calculation has some disadvantages, such as too large bending moment and overconservative reinforcement, etc. 2) Compared with twodimensional calculation, threedimensional modeling calculation results are more rational. The study results can provide references for similar projects in the future.
Key words: Metro station, shield hoisting shaft, temporary ring beam, SAP2000, finite elements, threedimensional integral calculation, twodimensional calculation
CLC Number:
U 451
GAO Tao, ZHAO Rui. Optimization Analysis of Calculation of Temporary Ring Beam for Shield Hoisting Shaft of Metro Station[J]. Tunnel Construction, 2016, 36(5): 544-548.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/ 10.3973/j.issn.1672-741X.2016.05.008
http://www.suidaojs.com/EN/Y2016/V36/I5/544