ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2016, Vol. 36 ›› Issue (6): 710-716.DOI: 10.3973/j.issn.1672-741X.2016.06.009

Previous Articles     Next Articles

Discrete Element Solidfluid Coupling Analysis of Influence of Groundwater on Shield Tunnel in Sandycobble Strata

WANG Jun, HE Chuan, LI Donglin, QI Chun, ZHOU Xiaojun   

  1. (Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University,Chengdu 610031, Sichuan, China)
  • Received:2015-08-25 Revised:2015-12-06 Online:2016-06-20 Published:2016-06-29

Abstract:

The influence of groundwater on load distribution of shield tunnel and ground deformation of Chengdu Metro Line No. 2 is analyzed microscopically by means of particle flow cate in two dimensions(PFC2D) method. The soil stress and water stress during shield tunneling and after shield passing are studied. The study results show that: 1) The stress on tunnel lining structure considering groundwater is smaller than that without considering groundwater; and the higher the water level is, the smaller the stress on tunnel lining stress is. 2) The stress redistribution of surrounding rocks is affected by groundwater after shield passing; and the arch crown is affected mostly and the arch shoulder is affected minimally. 3) The loose zone above tunnel arch crown bears the soil load; as a result, the effective stress on the tunnel is decreased and the deformation of the tunnel can be decreased.

Key words: Chengdu Metro, sandycobble strata, groundwater, shield tunnel, particle flow code(PFC)

CLC Number: