| [1] |
HOU Ye, YANG Chaoshuai, DING Yuxiang, HU Jie, LI Hongru, LI Xiaofeng, CAO Shuangli, HE Manchao.
Three-Dimensional Negative Poisson′s Ratio Active Support Systems for Rockburst Prevention and Control in Deep Tunnels
[J]. Tunnel Construction, 2026, 46(4): 852-868.
|
| [2] |
WANG Yanning, LI Taikai, MIN Xinhao.
State of the Art of Machine Learning in Tunnel Engineering
[J]. Tunnel Construction, 2026, 46(2): 233-245.
|
| [3] |
HUANG Shuhua.
Key Construction Technology and Application Practice
of Mechanized Connecting Passage of a Super-Large Diameter Shield Tunnel in Complex Water-Rich Strata
[J]. Tunnel Construction, 2025, 45(S1): 280-289.
|
| [4] |
CAI Caiwu.
Mechanical Effects of Vertical Shaft Construction in Intercity Railways Using Vertical Machinery Method
[J]. Tunnel Construction, 2025, 45(9): 1640-1648.
|
| [5] |
LIU Xiaolin.
Displacement Measurement Method Integrating Improved Oriented FAST and Rotated BRIEF Feature Points With Lucas-Kanade Pyramid Optical Flow and Its Engineering Application
[J]. Tunnel Construction, 2025, 45(8): 1459-1468.
|
| [6] |
GUO Defu, ZHANG Jingli, FANG Yuzhong, LYU Peilin, DI Huijie, ZHANG Hao, YANG Chen.
Practice and Innovation of Continuous Caisson Construction Technology for Underground Railway Stations in Jiaxing, China
[J]. Tunnel Construction, 2025, 45(8): 1577-1589.
|
| [7] |
SUO Xuhong, YAN Haowen, LI Zhenhong, ZHANG Dejin, SU Xiaoning, LIU Zhaoquan, TIAN Lin, GUAN Minglei, MA Huachuan.
Underwater Positioning Technology for Closure Joint of Shenzhen-Zhongshan Link Immersed Tunnel
[J]. Tunnel Construction, 2025, 45(7): 1370-1377.
|
| [8] |
SU Linwang, ZHAO Yiming, WANG Xuegang, ZUO Huanan.
Application of Nondominated Sorting Whale Optimization
Algorithm in Segment
Length Optimization of Yanjiang Immersed Tunnel in Shenzhen, China
[J]. Tunnel Construction, 2025, 45(5): 964-974.
|
| [9] |
HUANG Jun, AN Ping, DONG Fei, SHEN Yang, ZHAO Guang, CHEN Xikun.
Structural Response Analysis of Large-Diameter
Underwater Shield Tunnel During Operation
Period Under Scouring and Silting Action of Riverbed
[J]. Tunnel Construction, 2025, 45(4): 719-729.
|
| [10] |
SONG Zhanping, YANG Zifan, ZHANG Yuwei, HUO Runke.
Application Status and
Prospects of Deep Learning in Tunnels and
Underground Engineering
[J]. Tunnel Construction, 2025, 45(2): 221-255.
|
| [11] |
WU Senyang, CHEN Xiang, CHEN Peng, ZENG Yuhan.
Construction Risk Control
of Large-Section, Small-Spacing Rectangular Pipe-Jacking Metro Stations: A Case Study of Haibang
Metro Station in Guangzhou, China
[J]. Tunnel Construction, 2025, 45(2): 382-391.
|
| [12] |
SUN Chao, ZHANG Guangwei, DA Wuqiang, YU Zufeng.
Analysis of Diseases and
Treatment Measures for an Immersed Tunnel
[J]. Tunnel Construction, 2025, 45(2): 415-424.
|
| [13] |
WU Senyang, LI Qinglin, LI Lin, QIN Feng, CHEN Peng.
Establishment and Evaluation of a Comprehensive Early Warning System for Monitoring Highway Tunnel Deformation
[J]. Tunnel Construction, 2025, 45(12): 2240-2256.
|
| [14] |
ZHAO Hongbo, LIU Guoqing, ZHANG Changliang, ZHONG Huihong, SONG Shenyou, FAN Ziwu, PENG Yingjun, JIN Wenliang.
Application of Neutron Scattering Method for Identifying Voids at Steel Shell-Concrete Interfaces
[J]. Tunnel Construction, 2025, 45(12): 2266-2274.
|
| [15] |
NI Jiaze, LI Xiang, ZHANG Jinzhang, HUANG Hongwei.
Structural Safety Risk Analysis of Subsea Tunnels Crossing Fault Zones in Jiaozhou Bay Second Subsea Tunnel
[J]. Tunnel Construction, 2025, 45(12): 2287-2297.
|