ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2017, Vol. 37 ›› Issue (1): 48-55.DOI: 10.3973/j.issn.1672-741X.2017.01.008

Previous Articles     Next Articles

Design and Development of BIMbased Operation and Maintenance System of Highway Tunnel

HUANG Ting1, CHEN Lijuan2,*, SHI Peixin2, YU Caicheng2   

  1. (1. Zhejiang Highway & Water Transportation Engineering Consulting Corporation, Hangzhou 310004, Zhejiang, China; 2. Soochow University, Suzhou 215100, Jiangsu, China)
  • Received:2016-04-21 Revised:2016-09-22 Online:2017-01-20 Published:2017-01-24

Abstract: In recent years, the highway tunnel construction mileage has been increased many; however, the operation and maintenance management of highway tunnel is still challenged by backward technology and insufficient management configuration of professional. The building information modeling(BIM) technology is brought into operation and maintenance management of highway tunnel. The visualized and parameterized BIMbased operation and maintenance system is developed by formulating specific implementation plan and designing system structure. The BIMbased operation and maintenance platform of highway tunnel is established as an intuitive and convenient way of management, with Lingxia Tunnel of provincial highway 41 in Zhejiang as an example. The informatized management level of the highway tunnels has been improved by BIM technology.

Key words: highway tunnel, BIM, operation and maintenance management, visualization

CLC Number: