[1] |
CHEN Yinji, ZHANG Zhiguo, MU Linlong, CHEN Jie, LU Zheng, CHEN Zhongkan.
Numerical Simulation Analysis of Influence of Curved
Tunneling on Deformation of
Adjacent Strata and Segments
[J]. Tunnel Construction, 2023, 43(S1): 271-282.
|
[2] |
WANG Famin, MENG Qingjun, ZHANG Hao, LIU Changli, YANG Zhenxing, ZHANG Bing.
Analysis of Tunneling Parameters of a ShallowBuried
SuperLarge CrossSectional Rectangular Pipe Jacking Tunnel
[J]. Tunnel Construction, 2023, 43(2): 316-326.
|
[3] |
WANG Xuxiang, LIAN Jiye, MAO Jimin, YANG Xueqiang, SONG Limin.
Research on Three Dimensional Soil Failure Shapes and Settlements Around Shallow Buried Pipe Jacking Caisson
[J]. Tunnel Construction, 2022, 42(S1): 257-266.
|
[4] |
LI Yang, CHENG Peng, LI Peng, WANG Ning, LUO Changming, BI Chengcheng.
Research on Construction Technology for SmallRadius
Curved PipeCurtain Mined
Metro Stations
[J]. Tunnel Construction, 2022, 42(7): 1207-1218.
|
[5] |
MA Peng, SHIMADA Hideki, MA Baosong, HUANG Sheng, ZHOU Hao.
Research Status and Development Trends of Key Technologies
of Rectangular Pipe Jacking
[J]. Tunnel Construction, 2022, 42(10): 1677-1692.
|
[6] |
LU Kaidao.
In Situ Tests on Construction Load and Mechanical
Response ofShield
Tunnel in Underwater Gravel Stratum
[J]. Tunnel Construction, 2021, 41(1): 44-51.
|
[7] |
YANG Zhongyong, LIAO Shaoming, LIU Mengbo, ZHAO Guoqiang, XU Weizhong.
Theoretical and Practical Analysis of Vertical Jacking
Attitude of Large Crosssection
PipeRoof Box Culvert in Soft Soil Stratum
[J]. Tunnel Construction, 2020, 40(10): 1448-1454.
|
[8] |
WANG Hemin, XIAO Zunqun, TANG Dongsang, HE Jinjiang, ZHANG Weizhong.
Numerical Simulation and Field Monitoring of Construction Process of Rectangular Pipe Jacking in No. 1 Underground Passage of Shangdu Road Station on Zhengzhou Metro Line 4
[J]. Tunnel Construction, 2019, 39(S2): 110-119.
|
[9] |
XIONG Haoxiang, XU Qingshuang, REN Hui.
Investigation on Jacking Force Parameters of Curved Piperoofing Construction in Gongbei Tunnel
[J]. Tunnel Construction, 2019, 39(S1): 146-151.
|
[10] |
XIONG Haoxiang, REN Hui, WENG Yuanlin.
Analysis of Construction Organization Scheme of Fivebench Fourteenstep Excavation Applied to Gongbei Tunnel
[J]. Tunnel Construction, 2019, 39(2): 281-286.
|
[11] |
HE Shuang, HU Xiangdong.
Shear Test of Steel PipeFrozen Soil Interface in Freezesealing Pipe Roof Method
[J]. Tunnel Construction, 2019, 39(11): 1864-.
|
[12] |
HE Chao, ZHANG Peng, MA Baosong.
Calculation and Analysis of Pipe Jacking Spacing for Piperoof Project of Gongbei Tunnel
[J]. Tunnel Construction, 2019, 39(1): 94-101.
|
[13] |
WU Fubao, WANG Zipeng, XIA Caichu, DENG Yungang, LIU Yupeng.
Analytical Design Method for Yielding Pipe Length of Yielding Bolt
[J]. Tunnel Construction, 2019, 39(1): 119-124.
|
[14] |
ZHANG Jie SHI Peixin, PAN Jianli.
Study of Ground Frost Heave Control Technology Used in Gongbei Tunnel Constructed by Pipe Roof and Ground Freezing Method
[J]. Tunnel Construction, 2018, 38(5): 809-817.
|
[15] |
LIU Yang, SHI Peixin, PAN Jianli, YU Caicheng.
Analysis of Transverse Ground Settlement and Pipe Interaction of Superlarge Pipe Roofing in Gongbei Tunnel
[J]. Tunnel Construction, 2018, 38(10): 1680-1687.
|