ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2017, Vol. 37 ›› Issue (11): 1455-1461.DOI: 10.3973/j.issn.2096-4498.2017.11.015
Previous Articles Next Articles
SUN Zhenchuan1, 2, YOU Jinhu2
Received:
Revised:
Online:
Published:
Abstract:
The TBMbored Lingnan Tunnel of Hanjiang RiverWeihe River Water Conveyance Project crosses high pressure and waterrich fractured zones; and highpressure water inrush is serious during TBM construction. As a result, the fissure radial grouting technology, i.e. grouting diffluence + surface caulking + shallow plugging + deep reinforcement, is put forward. By adopting the radial grouting technology and new type of grouting material, the high pressure water inrush from the fissure has been effectively controlled and stopped. The calculation formulas for crack width, grouting volume and grouting pressure and control standards for grouting process are provided by taking the water inrush situation of Lingnan Tunnel for example. The application result of the technology, the water inrush volume of 7 800 m3/d (original one of 46 000 m3/d), indicates that the technology adopted is effective. The results can provide reference for radial grouting of similar highpressure waterrich fractured ground.
Key words: hard rock ground, high pressure waterrich fractured zone, TBM construction, water inrush, radial grouting
CLC Number:
U 455.43
SUN Zhenchuan, YOU Jinhu. Radialgrouting Waterstop Technology and Its Application to Highpressure Waterrich Hard Rock Tunnel[J]. Tunnel Construction, 2017, 37(11): 1455-1461.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.2096-4498.2017.11.015
http://www.suidaojs.com/EN/Y2017/V37/I11/1455
Rockburst Characteristics and Prevention and Control Technologies for Tunnel Boring Machine Construction of Deepburied Tunnels