[1] |
DU Lijie, ZHANG Zheng, LI Qingwei, ZHANG Weidong, DU Chuanqi, LIU Jiayi, YANG Yalei.
Comparative Analysis on Adaptability and Applications
of DoubleShield Open Tunnel Boring Machines
[J]. Tunnel Construction, 2023, 43(6): 921-928.
|
[2] |
GUO Weishe, HONG Kairong, GAO Pan, LI Fengyuan, , LI Shu′ao, , ZHAO Xu.
Status Quo and Prospects of Tunnel Intelligent Construction in China
[J]. Tunnel Construction, 2023, 43(4): 549-562.
|
[3] |
SHEN Yanjun, LYU You, LI Shuguang, ZHANG Jinyuan, MA Wen, ZHANG Lei, XU Zhenhao, HUANG Yong.
Research Progress of Tunnel Surrounding Rock
Classification Method and Application Trend of
"Artificial Intelligence+"
[J]. Tunnel Construction, 2023, 43(4): 563-582.
|
[4] |
ZHANG Jianming, SHI Kebin, DALAYIHAN Bahetebieke, SHAN Hongze, SHI Renyi, FU Tao, LU Zhipeng.
Evaluation and Prediction of TBM′s
Geological Adaptability Based on VariableWeight Set PairMultidimensional Linked
Normal Cloud Model
[J]. Tunnel Construction, 2023, 43(4): 645-657.
|
[5] |
LI Jianbin, JING Liujie, YANG Chen, LIN Fulong, ZHANG Na, LI Pengyu.
Discussion on Technical Characteristics and
Realization-Path of Intelligent TBMs
[J]. Tunnel Construction, 2023, 43(3): 355-368.
|
[6] |
CHEN Songlin, WANG Lichuan, HU Hengqian, WANG Shuying, YANG Zebin, CHONG Panpan, LU Chuang, CHEN Hongwei.
Fault and Fracture Zone Collapse Treatment Technology
for Open Tunnel Boring Machine
Applied in Beijiang Water Diversion Project
[J]. Tunnel Construction, 2023, 43(12): 2122-2132.
|
[7] |
WEN Bin.
Key Technology and Application of Efficient Tunneling
of an Extra-Long Tunnel
Bored by Two Tunnel Boring Machines
[J]. Tunnel Construction, 2022, 42(S1): 433-441.
|
[8] |
DU Chuangdong, HONG Kairong, LI Zhijun, YANG Yandong.
Key Technologies of Tunnel Boring Machine Passing
through Unfavorable Geology: a
Case Study of Entrance Section of a Plateau Railway Tunnel
[J]. Tunnel Construction, 2022, 42(7): 1274-1288.
|
[9] |
HONG Kairong, DU Yanliang, CHEN Kui, FENG Huanhuan, JIA Lianhui, XU Fei.
Full-Face Tunnel Boring Machines
(Shields/TBMs) in China: History, Achievements, and
Prospects
[J]. Tunnel Construction, 2022, 42(5): 739-756.
|
[10] |
LI Zhijun, CHEN Kui, CHEN Qiao, ZHOU Yi, LI Zeng, YU Jingbo, ZHANG Xiao.
Discussion on Open TBM Excavation Diameter of a
Plateau Railway Tunnel
[J]. Tunnel Construction, 2022, 42(5): 807-816.
|
[11] |
LIU Xiaochun.
Topological Optimization of Swing Structure of Tunnel
Boring Machine Carried Bolt Drill
[J]. Tunnel Construction, 2022, 42(1): 137-144.
|
[12] |
ZHANG Xinwei.
TBM Selection and Key Technologies of Qiandao Lake Water Distribution Project
[J]. Tunnel Construction, 2021, 41(S2): 612-619.
|
[13] |
WANG Heng.
Research on Lightweight Algorithm for Edge Terminal of
Rock Slag Classification
[J]. Tunnel Construction, 2021, 41(S1): 161-.
|
[14] |
JIA Jianbo, GAO Guangyi, WEN Xingming.
Comprehensive Treatment Techniques for LargeScale
Water and Mud Outburst in Gaoligongshan Tunnel
[J]. Tunnel Construction, 2021, 41(S1): 394-.
|
[15] |
GUO Zhi, TANG Xigang, HAN Lisen, TIAN Bin, DING Shaojun, LU Xiaofeng.
Study and Practice on Negative Ring Launching
Technique for
DoubleShield TBM Used in Qingdao Metro
[J]. Tunnel Construction, 2021, 41(S1): 425-.
|