ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2017, Vol. 37 ›› Issue (3): 264-274.DOI: 10.3973/j.issn.1672-741X.2017.03.002
Previous Articles Next Articles
GUAN Baoshu
Received:
Online:
Published:
Abstract:
The tunnel maintaining and management basic principle of early discovery and preventive maintaining, which can achieve good results with less work, is emphasized. In order to establish the preventive management system, 3 issues, i.e. requirements for tunnel functions and tunnel function management target establishment, checking and investigation methods for accurate information and determination of modeled tunnel variation causes and standards. Based on the experience of tunnel maintaining and management in Japan, the abovementioned 3 issues are introduced as follows: 1) For requirements for tunnel functions, safe transit should be guaranteed and the variation should be controlled within the service life of tunnel structures. 2) For checking and investigation methods for accurate information, the developing directions of checking and investigation methods for accurate information are less labor, standardization, high speed and electronization; the investigation and measuring methods, i.e. tunnel measuring trolley, monitoring system, highspeed borehole drilling system, ground penetrating radar and 3D laser scanning device, for tunnel surface degradation, surface defect, internal defect, hollows behind lining, clearance displacement and deformation are introduced. The checking results are regarded as estimation of structure durability. [JP2]3) For determination standards and models of tunnel variation types and variation strength, the basic views of unconsideration of tunnel service life, service life prediction before carrying out treatments and methods, integrity estimation and countermeasures for preventive management, are introduced. It is emphasized that the tunnel maintaining and management methods and system in China should be removed; and a new type of tunnel maintaining and management system for China should be developed.
Key words: tunnel, mining method, preventive management, maintaining management, tunnel function, variation, investigation, judge standard
CLC Number:
U 455.1
GUAN Baoshu. Tunneling by Mining Method: Lecture ⅩⅥ: Establishment of “Preventive Management” Predominated Comprehensive Tunnel Maintaining and Management System[J]. Tunnel Construction, 2017, 37(3): 264-274.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2017.03.002
http://www.suidaojs.com/EN/Y2017/V37/I3/264
Key Technologies of Cutterhead Configuration and Cutter Replacement for Large diameter Shield under High Water Pressure
Experimental Effect Prediction of Ground Conditioning of Water rich Sandy Stratum Based on BP Neural Network
Fullscale Experimental Study on Bending Performance of Segmental Joints of Large Crosssection Shield Tunnel under Pure Compressive Bending Condition
Study on Optimization of Emergency Rescue Station of Yuntunbao Tunnel on ChengduLanzhou Railway
Launching and Receiving Technology of Large Crosssection Horseshoeshaped Shield Used in Baicheng Tunnel
Design and Analysis of a New TBM Propulsion System with Small Turning Radius
Study on Key Technologies and Application of Engineering Big Data Management Platform of Tunnel Boring Machine
Improvement Technology of Bearing Capacity of Prestressed Anchor Cable in Large span Tunnel: a Case Study on Badaling Great Wall Station