Research on Construction Technologies for TBM Continuous Boring through Limestone Section of Bid Section No.4 of Songhua River Water Conveyance Project

ZHAO Hailei1, CHEN Kui1, ZHOU Jianjun1, ZHANG Bing1, YANG Bin2, WANG Zhenfei2   

  1. (1. State Key Laboratory of Shield Machine and Boring Technology, Zhengzhou 450001, Henan, China; 2. China Railway Tunnel Stock Co., Ltd., Zhengzhou 450001, Henan, China)
  • Received:2016-11-25 Revised:2017-01-25 Online:2017-03-20 Published:2017-03-30

Abstract:

The open TBM bores through limestone section of 7 km long of Bid Section No. 4 of Songhua River Water Conveyance Project. The advanced geological prediction system and lining system of TBM are designed based on characteristics, i.e. long distance, large crosssection, rapid boring and strengthened support of the project. And then, corresponding construction technologies and countermeasures are decided for bad geological conditions. The TBM has successfully bored through the limestone section; the construction cost has been reduced and the construction schedule has been shortened by relevant design, construction technologies and countermeasures adopted. 

Key words: Songhua River Water Conveyance Project, tunnel, open TBM, limestone section