The control of stability of surrounding rocks is difficult during construction of large crosssection soft rock tunnel. A numerical model of Guchengling Tunnel on BaojiLanzhou Passengerdedicated Railway is established based on surveying and design data, construction technology and monitoring data. The deformation characteristics of large crosssection soft rock tunnels are analyzed and the influence of invert arch step distance and bench length on stability of large crosssection soft rock tunnels is revealed. The numerical test results are regarded as guidance for construction of large deformation section of Guchengling Tunnel, the accumulated deformation of primary support has been reduced by 70%.
Key words: large crosssection soft rock tunnel, step distance of invert arch, bench length, numerical simulation, primary support deformation, internal force of structure, stability of surrounding rock
CLC Number:
U 45
SHI Jiyao, WANG Yue. Analysis of Influence of Invert Arch Step Distance and Bench Length on Stability of Large Crosssection Soft Rock Tunnels[J]. Tunnel Construction, 2017, 37(4): 428-434.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2017.04.007
http://www.suidaojs.com/EN/Y2017/V37/I4/428
Noise Propagation Characteristics of Tunnel Construction by Drilling and Blasting Method